Pushing boundaries of nano-dimensional metrology by light
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
Český metrologický institut
Contest type
M2 - International cooperation
Contract ID
8B21001
Alternative language
Project name in Czech
Pushing boundaries of nano-dimensional metrology by light
Annotation in Czech
The overall goal of this project is to push the boundaries of optical measurement methods by realising a new generation of optical metrology systems, with unprecedented performances in terms of spatial resolution, traceability, reliability, and robustness. The objectives of the project are: 1. To develop accurate methods for measuring lateral features size below 10 nm at uncertainty levels of 0.1 nm using two types of far-field illumination far-field detection optical methods; 2. To develop innovative inelastic, non-linear or resonant optical metrology methods with a target uncertainty level of 1 nm, such as linear and non-linear SIM, and pump-probe Super Resolution Microscopy (SRM) techniques (e.g. Surface plasmon resonances (SPR) assisted Raman, coherent multiphoton-Raman and Stimulated Emission Depletion (STED). 3. To develop innovative imaging methods 4. To facilitate the take up of the knowledge, technology and measurement infrastructure developed in the project by the measurement supply chain, standards developing organisations (ISO, CEN) and end users in nanotechnology, micro-nanoelectronics, photonics and advanced materials.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
10700 - Other natural sciences
OECD FORD - secondary branch
10700 - Other natural sciences
OECD FORD - another secondary branch
10700 - Other natural sciences
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
—
Solution timeline
Realization period - beginning
Sep 1, 2021
Realization period - end
Aug 31, 2024
Project status
K - Ending multi-year project
Latest support payment
Jan 30, 2024
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP24-MSM-8B-R
Data delivery date
Feb 19, 2024
Finance
Total approved costs
1,128 thou. CZK
Public financial support
1,128 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK