Metrology to support legislation for electric vehicle supply equipment
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
EPM Call 2025
Main participants
Český metrologický institut
Contest type
RP - Co-financing of EC programme
Contract ID
-
Alternative language
Project name in Czech
Metrology to support legislation for electric vehicle supply equipment
Annotation in Czech
The upcoming Europe-wide regulation of electric vehicle supply equipment, (EVSE) under the Directive 2014/32/EU requires the use of efficient easy-to-use measurement systems and procedures for testing in the field for market surveillance. This will ensure reliable measurements of supplied energy and thereby consumer protection. However, the field testing of high-power 300 kW EVSE currently lacks equipment that is compatible with all charging stations and capable of testing the complete measuring range of the charging station with efficient procedures. This means that numerous measuring points are required. Whilst for the mega-watt-charging systems for heavy-duty vehicles, the power of the charging station exceeds the power of the testing unit, meaning that market surveillance is not possible. This project will realise the necessary metrology infrastructure needed to enable charging stations to comply with the European Directive 2014/32/EU for measuring instruments, including EVSE measurement systems. It will create the capability for testing existing and future DC EVSE and will provide guidance for implementing phantom power testing for MCS.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20205 - Automation and control systems
OECD FORD - secondary branch
—
OECD FORD - another secondary branch
—
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JD - Use of computers, robotics and its application
Solution timeline
Realization period - beginning
Jul 1, 2026
Realization period - end
Jun 30, 2029
Project status
Z - Beginning multi-year project
Latest support payment
—
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP26-MSM-9B-R
Data delivery date
Nov 4, 2026
Finance
Total approved costs
3,402 thou. CZK
Public financial support
1,702 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK