All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Development of the Modernized Workplace for the Measurement of Interlocking Relays

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    IMPULSE

  • Call for proposals

    IMPULS 5 (SMPO20082)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FI-IM5/011

Alternative language

  • Project name in Czech

    Vývoj modernizovaného měřícího pracoviště pro zabezpečovací relé

  • Annotation in Czech

    Dvoufázová relé se v zabezpečovací technice používají jako kolejová relé vyhodnocující volnost nebo obsazení kolejových obvodů. V intervalech stanovených provozovatelem se musí provádět pravidelná měření parametrů těchto relé. Správnost přeměření všech podstatných parametrů je nezbytnou podmínkou jejich činnosti zajišťující bezpečnost železniční dopravy. Měření se bude provádět na měřící soupravě řízené z osobního počítače. Postup měření je popsán v předpisu ČD T115/1 "Opravy výměnných dílů zabezpečovacích zařízení". Součástí měření bude tisk měřícího protokolu a archivace naměřených dat. Měřící souprava bude tvořena dvěma generátory sinusového signálu s výkonnými zesilovači a měřícími moduly pro měření proudů a napětí cívek. U generovaných signálů bude možné měnit jejich vzájemný fázový posuv v rozsahu 0 až 360. Souprava bude vybavena rozhraními USB, příp. EIA/TIA 232.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JS - Reliability and quality management, industrial testing

  • CEP - secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20306 - Audio engineering, reliability analysis

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project was realization of the functional prototype of the workstation for the measurement of phase sensitive safety relays DSR and DSŠ types.This objec.was executed and designed workstation was verified in the operating and is prepared to production

Solution timeline

  • Realization period - beginning

    Apr 1, 2008

  • Realization period - end

    Dec 31, 2010

  • Project status

    U - Finished project

  • Latest support payment

    Jun 11, 2010

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP11-MPO-FI-U/01:1

  • Data delivery date

    Jun 22, 2011

Finance

  • Total approved costs

    4,573 thou. CZK

  • Public financial support

    1,950 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    2,623 thou. CZK