All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*High-voltage equipment for reactive power-control and harmonic filtering

Project goals

*Modern design of equipments for reactive power control and filtering needs new types of high voltage convertors using optothyristors and IGCT elements for pulse controlled rectifier. Beyond development, design and testing of high-voltage converters is important goal of project optimizing of control algorithmes for pulse controlled rectifiers and active filters for control of reactive and deforming power on converters input. Development and design of high-voltage reactive power control eqipment for railways and other use. Development and design of high voltage active filters. Development and design of active rectifier for high voltage converter with IGCT semiconductorelements for voltage level 10 kV.

Keywords

reactive power controlfilteringsemiconductor converteractive filterpulse controlled rectifierharmonic distortion, reactive power

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 5 (SMPO20081)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA5/123

Alternative language

  • Project name in Czech

    *Vysokonapěťová kompenzační a filtrační zařízení

  • Annotation in Czech

    *Moderní řešení filtračních a kompenzačních zařízení vyžaduje použití nových typů měničů (vn měniče s optotyristory a pulsní usměrňovače jako součást aktvních filtrů a napájecích měničů se součástkami IGCT). Kromě vývoje, návrhu a zkoušek těchto měničů je cílem projektu optimalizace řídicích algoritmů pro řízení pulsních usměrňovačů a aktivních filtrů, umožňujících řízení jalových a deformačních výkonů na vstupu měničů. Návrh a konstrukce vysokonapěťového kompenzátoru bez transformátoru pro drážní a jiné účely. Návrh a ověření metodiky řešení aktivních filtrů pro vu aplikace. Návrh a ověření aktivního usměrňovače pro střídače vysokých výkonů se součástkami IGCT na napěťovou hladinu 10 kV.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    JA - Electronics and optoelectronics

  • CEP - another secondary branch

  • 20201 - Electrical and electronic engineering
    20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Converter 27 kV was developed, realised and tested on railway station with very good results.

Solution timeline

  • Realization period - beginning

    Apr 1, 2008

  • Realization period - end

    Dec 31, 2010

  • Project status

    U - Finished project

  • Latest support payment

    Apr 22, 2010

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP11-MPO-FT-U/01:1

  • Data delivery date

    Jun 22, 2011

Finance

  • Total approved costs

    32,807 thou. CZK

  • Public financial support

    10,900 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    21,908 thou. CZK

Basic information

Recognised costs

32 807 CZK thou.

Public support

10 900 CZK thou.

33%


Provider

Ministry of Industry and Trade

CEP

JE - Non-nuclear power engineering, energy consumption and utilization

Solution period

01. 04. 2008 - 31. 12. 2010