All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Stochastic stability and transition processes in interaction of non-conservative gyroscopic systems with moving continuum

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 12 (SGA02009GA-ST)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    103-09-0094

Alternative language

  • Project name in Czech

    Stochastická stabilita a přechodové procesy v interakci nekonzervativních gyroskopických soustav s pohyblivým vnějším zatížením

  • Annotation in Czech

    Geometrické a fyzikální imperfekce soustav mají charakter ná­hodných procesů v prostoru a v času. Náhodnými procesy s korelační vazbou k imperfekcím jsou i statická a dynamická zatížení, která vyplývají ze silně nelineárních stochas­tických interakcí soustavy a pohybujícího se prostředí (obtékající kapalina, ubíhající vozovka, atd.). Formulace problémů stochastické stability pohybu, bifurkačních mechanizmů a post-kritických stavů nekonzervativních gyroskopických soustav vycházejí ze stochastické formulace Hamiltonova principu a opírají se o Markovovy procesy a FP rovnice. Pozornost se věnuje Hopfovým bifurkacím, energetickým barierám a autoparametrickým jevům. Metody řešení stochastických diferenciálních soustav a FP rovnic kombinují variační a numerické postupy (maximum entropie PDF, MKP, simulace, atd.). Stochastické identifikace se řeší přes zobecněné FP rovnice odvozené z optimálních aposteriorních odhadů. Analytická a numerická řešení pro­bíhají současně s experimenty. Výsledky se ilustrují na jevech aeroelastické stability a dalších nekonzervativních problémech.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JM - Structural engineering

  • CEP - secondary branch

    JN - Civil engineering

  • CEP - another secondary branch

    JS - Reliability and quality management, industrial testing

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering<br>20102 - Construction engineering, Municipal and structural engineering<br>20306 - Audio engineering, reliability analysis

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The benefit of the project can be seen in the development of experimental and numerical approaches to stochastic stability, transition and post-critical effects of non-linear dynamic systems. The budget drawing schedule during the work on the project waseffective and well described. The whole project was solved on very good scientific level with adequate publication activity.

Solution timeline

  • Realization period - beginning

    Jan 1, 2009

  • Realization period - end

    Dec 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Jun 6, 2013

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP14-GA0-GA-U/01:1

  • Data delivery date

    Jul 1, 2014

Finance

  • Total approved costs

    6,660 thou. CZK

  • Public financial support

    6,660 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK