Fabrication and structure control of functional metal nano-particles on oxide ceramics
Public support
Provider
Czech Science Foundation
Programme
Standard projects
Call for proposals
Standardní projekty 12 (SGA02009GA-ST)
Main participants
—
Contest type
VS - Public tender
Contract ID
106/09/1264
Alternative language
Project name in Czech
Příprava a kontrola struktury funkčních kovových nanočástic na oxidové keramice
Annotation in Czech
Synthesis of transition metal (i.e., Ni, Co, Ag and Au) ultra-nano-particle arrays with advanced catalytic, magnetic and optical properties on oxide surfaces (MgO, SiO2 a Al2O3) under controlled experimental conditions using various physical deposition methods.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
JJ - Other materials
CEP - secondary branch
JG - Metallurgy, metal materials
CEP - another secondary branch
JI - Composite materials
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20501 - Materials engineering<br>20502 - Paper and wood<br>20503 - Textiles; including synthetic dyes, colours, fibres (nanoscale materials to be 2.10; biomaterials to be 2.9)<br>20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)<br>21001 - Nano-materials (production and properties)<br>21002 - Nano-processes (applications on nano-scale); (biomaterials to be 2.9)
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The project gone according to plan both in terms of expertise and in terms of disbursement of funds.
Solution timeline
Realization period - beginning
Jan 1, 2009
Realization period - end
Dec 31, 2011
Project status
U - Finished project
Latest support payment
Apr 16, 2011
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP12-GA0-GA-U/02:2
Data delivery date
May 2, 2016
Finance
Total approved costs
972 thou. CZK
Public financial support
972 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK