All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Beyond visible: Novel semiconductors for future organic semitransparent photovoltaics

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    SGA0202600001

  • Main participants

    Vysoké učení technické v Brně / Fakulta chemická

  • Contest type

    VS - Public tender

  • Contract ID

    26-20968S

Alternative language

  • Project name in Czech

    Beyond visible: Novel semiconductors for future organic semitransparent photovoltaics

  • Annotation in Czech

    Semitransparent organic solar cells (ST-OSCs) offer a disruptive opportunity to combine energy harvesting with protection against excessive thermal radiation, finding applications as photovoltaic windows or greenhouses. A key challenge lies in the inherent balancing of power conversion efficiency (PCE) and average visible transmittance, which current materials do not provide. To address this, novel semiconductors with strong FR-NIR absorption will be synthesized and the fundamental electronic processes on molecular level determining their optoelectronic properties systematically investigated. Experimental studies by ultrafast time-resolved spectroscopy and other advanced techniques will be supported by quantum chemical calculations. Detailed understanding of the relations between ultrafast optoelectronic processes, molecular structure of the semiconductors and their transparency and performance will lead to proposal of next-generation semitransparent semiconductors and devices. Finally, the experimental and theoretical findings will be validated in a model ST-OSC.

Scientific branches

  • R&D category

    ZV - Basic research

  • OECD FORD - main branch

    20501 - Materials engineering

  • OECD FORD - secondary branch

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    JG - Metallurgy, metal materials<br>JP - Industrial processes and processing

Solution timeline

  • Realization period - beginning

    Jan 1, 2026

  • Realization period - end

    Dec 31, 2028

  • Project status

    Z - Beginning multi-year project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP26-GA0-GA-R

  • Data delivery date

    Jun 4, 2026

Finance

  • Total approved costs

    9,579 thou. CZK

  • Public financial support

    9,264 thou. CZK

  • Other public sources

    315 thou. CZK

  • Non public and foreign sources

    0 thou. CZK