Sparse-Sampling High-Speed Scanning Probe Microscopy
Public support
Provider
Czech Science Foundation
Programme
Standard projects
Call for proposals
SGA0202600001
Main participants
Český metrologický institut
Contest type
VS - Public tender
Contract ID
26-23708S
Alternative language
Project name in Czech
Sparse-Sampling High-Speed Scanning Probe Microscopy
Annotation in Czech
Data acquired in High-Speed Scanning Probe Microscopy (HS-SPM) are sampled along unusual and from a practical standpoint irregular space-time trajectories. Artefacts in the data, which are common, are difficult to deal with. Current data processing techniques, software tools and even theory are inadequate, in particular for quantitative analysis and nanometrology. This project aims to advance theoretical concepts, methodology, implementation and hardware tools for quantitative data treatment in HS-SPM. Measuring all degrees of freedom in the scanner motion, working with full raw data, including the acquisition time of every point, and using optimized scan paths, will enable improvements in both imaging speed and data accuracy. The developed method will be applied to study the fast time evolution studies of phase changing materials. However, they will be general and applicable also to other research fields where HS-SPM is used, e.g. in life sciences.
Scientific branches
R&D category
ZV - Basic research
OECD FORD - main branch
20201 - Electrical and electronic engineering
OECD FORD - secondary branch
—
OECD FORD - another secondary branch
—
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JA - Electronics and optoelectronics<br>JB - Sensors, detecting elements, measurement and regulation
Solution timeline
Realization period - beginning
Jan 1, 2026
Realization period - end
Dec 31, 2028
Project status
Z - Beginning multi-year project
Latest support payment
—
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP26-GA0-GA-R
Data delivery date
May 19, 2026
Finance
Total approved costs
7,494 thou. CZK
Public financial support
7,494 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK