All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Web crippling failure mechanism of cold formed steel sections

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    SGA0202600001

  • Main participants

    České vysoké učení technické v Praze / Fakulta stavební

  • Contest type

    VS - Public tender

  • Contract ID

    26-23956S

Alternative language

  • Project name in Czech

    Web crippling failure mechanism of cold formed steel sections

  • Annotation in Czech

    Web crippling in cold-formed steel sections is a localized failure due to concentrated loads causing excessive deformation or buckling, typically at supports. With increasing demand on steel saving and higher use of cold-formed steel for primary structures and for spanning larger distances, understanding web crippling is crucial. Design procedures rely on empirical equations from experimental studies, originating from AISI 1968 and other standards. Despite improvements, current methods remain overly conservative. This project aims to develop an analytical yield line model for web crippling in single- and multi-web sections (trapezoidal sheeting, Zeds and lipped channels) and better understanding to the web crippling phenomena. Additionally, the tests and numerical models generated during the project will be used for re-calibration of the Eurocode empirical design formulas and recommendations for cold-formed steel web crippling design assisted by FE analysis.

Scientific branches

  • R&D category

    ZV - Basic research

  • OECD FORD - main branch

    20102 - Construction engineering, Municipal and structural engineering

  • OECD FORD - secondary branch

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    GB - Agricultural machines and construction<br>JM - Structural engineering

Solution timeline

  • Realization period - beginning

    Jan 1, 2026

  • Realization period - end

    Dec 31, 2028

  • Project status

    Z - Beginning multi-year project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP26-GA0-GA-R

  • Data delivery date

    Apr 27, 2026

Finance

  • Total approved costs

    4,991 thou. CZK

  • Public financial support

    4,991 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK