Ringing Astrophysical Black Holes: Environmental Effects on Quasinormal Modes
Public support
Provider
Czech Science Foundation
Programme
—
Call for proposals
SGA0202600005
Main participants
Astronomický ústav AV ČR, v. v. i.
Contest type
VS - Public tender
Contract ID
26-20481O
Alternative language
Project name in Czech
Ringing Astrophysical Black Holes: Environmental Effects on Quasinormal Modes
Annotation in Czech
The advent of gravitational wave astronomy has opened new opportunities for probing the fundamental properties of black holes (BHs) and testing the nature of gravity. Among the most promising methods is the so-called BH spectroscopy, which utilizes the characteristic ringing of BHs described by quasinormal modes (QNMs)–a set of exponentially damped oscillations. Deviations from the distinctive QNM spectrum of a Kerr BH could challenge general relativity and significantly deepen our understanding of BHs. However, real astrophysical BHs are not isolated. They reside in some astrophysical environment, such as an accretion disc, or dark matter halo which modifies the spacetime geometry and, consequently, affects QNMs. This project aims to advance our understanding of the environmental effects and analyze their spectral features in QNM spectrum. Ultimately, we aim to assess the robustness of black hole spectroscopy as a tool for fundamental physics by determining whether imprints of theories beyond general relativity can be disentangled from those caused by astrophysical environments.
Scientific branches
R&D category
ZV - Basic research
OECD FORD - main branch
10308 - Astronomy (including astrophysics,space science)
OECD FORD - secondary branch
10102 - Applied mathematics
OECD FORD - another secondary branch
—
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
BD - Information theory<br>BN - Astronomy and celestial mechanics, astrophysics
Solution timeline
Realization period - beginning
Oct 1, 2026
Realization period - end
Dec 31, 2029
Project status
Z - Beginning multi-year project
Latest support payment
—
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP26-GA0-GN-R
Data delivery date
Sep 10, 2026
Finance
Total approved costs
4,860 thou. CZK
Public financial support
4,860 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK