Thermic interaction between continuous welded rail and the bridge
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F12%3APU102003" target="_blank" >RIV/00216305:26110/12:PU102003 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
čeština
Original language name
Thermic interaction between continuous welded rail and the bridge
Original language description
Czech railway infrastructure manager has described design principles and recommendations for installation of continuous welded rail on bridges in the regulation which summarizes experience of bridge ? rail interaction since introduction of continuous welded rail as a common structure. The regulation covers the most common cases of bridge ? rail interaction concerning type of a bridge structure, deck and bearing arrangement as well as a design of rail superstructure components. The bridge in Usti nad Orlici is situated on main railway line Berlin ? Prague ? Brno ? Vienna/Bratislava. A construction of the new bridge is a part of railway station reconstruction project focused on a speed increase. The design of bridge supports position had to take into account the situation of the confluence of two rivers and road which led to a design of nonstandard arrangement of the bridge bearings. This design required special attention to an assessment of the particular bridge ? rail interaction. Two
Czech name
Thermic interaction between continuous welded rail and the bridge
Czech description
Czech railway infrastructure manager has described design principles and recommendations for installation of continuous welded rail on bridges in the regulation which summarizes experience of bridge ? rail interaction since introduction of continuous welded rail as a common structure. The regulation covers the most common cases of bridge ? rail interaction concerning type of a bridge structure, deck and bearing arrangement as well as a design of rail superstructure components. The bridge in Usti nad Orlici is situated on main railway line Berlin ? Prague ? Brno ? Vienna/Bratislava. A construction of the new bridge is a part of railway station reconstruction project focused on a speed increase. The design of bridge supports position had to take into account the situation of the confluence of two rivers and road which led to a design of nonstandard arrangement of the bridge bearings. This design required special attention to an assessment of the particular bridge ? rail interaction. Two
Classification
Type
D - Article in proceedings
CEP classification
JN - Civil engineering
OECD FORD branch
—
Result continuities
Project
—
Continuities
Z - Vyzkumny zamer (s odkazem do CEZ)
Others
Publication year
2012
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Road and Rail infrastructure II. Proceedings of the Conference CETRA 2012
ISBN
978-953-6272-49-5
ISSN
—
e-ISSN
—
Number of pages
7
Pages from-to
491-497
Publisher name
University of Zagreb
Place of publication
Zagreb, Croatia
Event location
Zagreb
Event date
May 7, 2012
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—