All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Thermic interaction between continuous welded rail and the bridge

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F12%3APU102003" target="_blank" >RIV/00216305:26110/12:PU102003 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    čeština

  • Original language name

    Thermic interaction between continuous welded rail and the bridge

  • Original language description

    Czech railway infrastructure manager has described design principles and recommendations for installation of continuous welded rail on bridges in the regulation which summarizes experience of bridge ? rail interaction since introduction of continuous welded rail as a common structure. The regulation covers the most common cases of bridge ? rail interaction concerning type of a bridge structure, deck and bearing arrangement as well as a design of rail superstructure components. The bridge in Usti nad Orlici is situated on main railway line Berlin ? Prague ? Brno ? Vienna/Bratislava. A construction of the new bridge is a part of railway station reconstruction project focused on a speed increase. The design of bridge supports position had to take into account the situation of the confluence of two rivers and road which led to a design of nonstandard arrangement of the bridge bearings. This design required special attention to an assessment of the particular bridge ? rail interaction. Two

  • Czech name

    Thermic interaction between continuous welded rail and the bridge

  • Czech description

    Czech railway infrastructure manager has described design principles and recommendations for installation of continuous welded rail on bridges in the regulation which summarizes experience of bridge ? rail interaction since introduction of continuous welded rail as a common structure. The regulation covers the most common cases of bridge ? rail interaction concerning type of a bridge structure, deck and bearing arrangement as well as a design of rail superstructure components. The bridge in Usti nad Orlici is situated on main railway line Berlin ? Prague ? Brno ? Vienna/Bratislava. A construction of the new bridge is a part of railway station reconstruction project focused on a speed increase. The design of bridge supports position had to take into account the situation of the confluence of two rivers and road which led to a design of nonstandard arrangement of the bridge bearings. This design required special attention to an assessment of the particular bridge ? rail interaction. Two

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JN - Civil engineering

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    Z - Vyzkumny zamer (s odkazem do CEZ)

Others

  • Publication year

    2012

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Road and Rail infrastructure II. Proceedings of the Conference CETRA 2012

  • ISBN

    978-953-6272-49-5

  • ISSN

  • e-ISSN

  • Number of pages

    7

  • Pages from-to

    491-497

  • Publisher name

    University of Zagreb

  • Place of publication

    Zagreb, Croatia

  • Event location

    Zagreb

  • Event date

    May 7, 2012

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article