Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F46747885%3A24220%2F24%3A00011847" target="_blank" >RIV/46747885:24220/24:00011847 - isvavai.cz</a>
Alternative codes found
RIV/46747885:24620/24:00011847
Result on the web
<a href="https://www.mdpi.com/2412-3811/9/2/24" target="_blank" >https://www.mdpi.com/2412-3811/9/2/24</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.3390/infrastructures9020024" target="_blank" >10.3390/infrastructures9020024</a>
Alternative languages
Result language
angličtina
Original language name
Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods
Original language description
Construction projects, especially those for commercial purposes, require thorough planning and control to ensure success within predetermined budgets and timelines. This research, conducted in Mashhad, Iran, employs the analytic hierarchy process (AHP) and VIKOR methods to identify and rank factors influencing delays in high-rise projects. The study, based on a sample of 40 projects, emphasizes the comprehensive nature of our research method. The scale for features in project selection includes societal importance (with different applications including cultural hubs, affordable housing initiatives, and urban renewal for social equity), size (less and more than 20 units in residential projects), and diversity (mixed-use development, inclusive infrastructure, and cultural and recreational spaces), contributing to a comprehensive analysis of construction delays. Expert project managers and engineers provided insights through two questionnaires, and their responses underwent thorough analysis. Our findings not only underscore the significance of factors contributing to project success but also rank their impact on the likelihood of delays. The study reveals that the negative effects of these factors on cost, time, and project quality vary. Time emerges as the most influential parameter, with approximately six times more impact on cost and nine times more on quality. Contractor financial weakness, delays in allocating financial and credit resources, insufficient project resource allocation, contractor technical and executive weakness, and a lack of proper implementation and project control are identified as the most important factors contributing to delays.
Czech name
—
Czech description
—
Classification
Type
J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
<a href="/en/project/LM2023066" target="_blank" >LM2023066: Nanomaterials and Nanotechnologies for Environment Protection and Sustainable Future</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2024
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Infrastructures
ISSN
2412-3811
e-ISSN
—
Volume of the periodical
9
Issue of the periodical within the volume
2
Country of publishing house
CH - SWITZERLAND
Number of pages
22
Pages from-to
—
UT code for WoS article
001169884000001
EID of the result in the Scopus database
2-s2.0-85187250429