Total Workplace rationalization
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23210%2F15%3A43925284" target="_blank" >RIV/49777513:23210/15:43925284 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Total Workplace rationalization
Original language description
The contribution deals with total rationalization of several workplaces. There were the analysis of operation sequences, necessary fixtures, jigs, spatial arrangement, etc. performed. The rationalization methodology was the same for all workplaces - specifically for the upright mechanism, Magni and Meti assembly, Pit ladder assembly. Based on the analysis were determined main problems that provoked a need to standardize workplaces. Rationalization lies in optimizing the individual sections related to design suitable jigs for individual workplaces. Consequently it was necessary to create completely new operation standards as well as new workplace layout.
Czech name
—
Czech description
—
Classification
Type
O - Miscellaneous
CEP classification
JP - Industrial processes and processing
OECD FORD branch
—
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2015
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů