Stanovení délky stavebního procesu na základě odhadu produktivity práce (případová studie)
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F21%3A10247948" target="_blank" >RIV/61989100:27120/21:10247948 - isvavai.cz</a>
Result on the web
<a href="http://www.otmcj" target="_blank" >http://www.otmcj</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.2478/otmcj-2021-0031" target="_blank" >10.2478/otmcj-2021-0031</a>
Alternative languages
Result language
čeština
Original language name
Determination of construction process duration based on labor productivity estimation: A case study Determination of construction process duration based on labor productivity estimation: A case study
Original language description
Monitoring labor productivity is one of the key issues in the construction project planning process how to decrease construction costs. The CONTEC automated system combined with statistical methods assists in predicting the amount of time required to complete construction works according to the specified number of deployed work crews, technological processes and labour required for certain production in person-hours. This study applies statistical analyses and probability theories of plastering work, which represents a labor-intensive construction process. The goal of the research is to determine the probability of completion of the construction process based on monitoring the mean value of performance. By application of statistical analyses has been proved a decrease in the performance standard compared to the planned values given in the CONTEC database. The decrease in performance, which was also caused by occurrence of days with unfavorable climatic conditions and demonstrated by performing interval estimates based on the collection of statistical data, was afterwards confirmed by a relative frequency test. The measures have been taken, in terms of establishing the required number of personnel capacities for com- plying with the construction schedule.
Czech name
Determination of construction process duration based on labor productivity estimation: A case study Determination of construction process duration based on labor productivity estimation: A case study
Czech description
Monitoring labor productivity is one of the key issues in the construction project planning process how to decrease construction costs. The CONTEC automated system combined with statistical methods assists in predicting the amount of time required to complete construction works according to the specified number of deployed work crews, technological processes and labour required for certain production in person-hours. This study applies statistical analyses and probability theories of plastering work, which represents a labor-intensive construction process. The goal of the research is to determine the probability of completion of the construction process based on monitoring the mean value of performance. By application of statistical analyses has been proved a decrease in the performance standard compared to the planned values given in the CONTEC database. The decrease in performance, which was also caused by occurrence of days with unfavorable climatic conditions and demonstrated by performing interval estimates based on the collection of statistical data, was afterwards confirmed by a relative frequency test. The measures have been taken, in terms of establishing the required number of personnel capacities for com- plying with the construction schedule.
Classification
Type
J<sub>SC</sub> - Article in a specialist periodical, which is included in the SCOPUS database
CEP classification
—
OECD FORD branch
20100 - Civil engineering
Result continuities
Project
—
Continuities
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Others
Publication year
2021
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Organization, Technology and Management in Construction
ISSN
1847-5450
e-ISSN
—
Volume of the periodical
neuveden
Issue of the periodical within the volume
30.9.9.2021
Country of publishing house
HR - CROATIA
Number of pages
17
Pages from-to
2521-2538
UT code for WoS article
000724279800002
EID of the result in the Scopus database
2-s2.0-85120899403