Determination of construction process duration based on labor productivity estimation: A case study

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F21%3A00370264" target="_blank" >RIV/68407700:21110/21:00370264 - isvavai.cz</a>

  • Result on the web

    <a href="https://doi.org/10.2478/otmcj-2021-0031" target="_blank" >https://doi.org/10.2478/otmcj-2021-0031</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.2478/otmcj-2021-0031" target="_blank" >10.2478/otmcj-2021-0031</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Determination of construction process duration based on labor productivity estimation: A case study

  • Original language description

    Monitoring labor productivity and how to decrease construction costs are the key issues in the planning process of a construction project. The CONTEC automated system combined with statistical methods assists in predicting the amount of time required to complete construction works according to the specified number of deployed work crews, technological processes, and labor required for certain production in person-hours. This study applies statistical analyses and probability theories for plastering work, which represents a labor-intensive construction process. The goal of the research is to determine the probability of completion of the construction process based on monitoring the mean value of performance. By application of statistical analyses a decrease in the performance standard has been proved compared with the planned values given in the CONTEC database. The decrease in performance, which was also caused by the number of days with unfavorable climatic conditions and demonstrated by performing interval estimates based on the collection of statistical data, was later confirmed by a relative frequency test. The measures taken were in terms of establishing the required number of personnel capacities for complying with the construction schedule. 2021 Darja Kubečková et al., published by Sciendo.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>SC</sub> - Article in a specialist periodical, which is included in the SCOPUS database

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    N - Vyzkumna aktivita podporovana z neverejnych zdroju

Others

  • Publication year

    2021

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Organization, Technology and Management in Construction: an International Journal

  • ISSN

    1847-6228

  • e-ISSN

    1847-6228

  • Volume of the periodical

    13

  • Issue of the periodical within the volume

    2

  • Country of publishing house

    PL - POLAND

  • Number of pages

    18

  • Pages from-to

    2521-2538

  • UT code for WoS article

    000724279800002

  • EID of the result in the Scopus database

    2-s2.0-85120899403