Time Connection of Subsequent Construction Processes Estimated by Statistical Method

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F22%3A10249621" target="_blank" >RIV/61989100:27120/22:10249621 - isvavai.cz</a>

  • Alternative codes found

    RIV/68407700:21110/22:00366617

  • Result on the web

    <a href="http://www.mdpi.com" target="_blank" >http://www.mdpi.com</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.3390/app12073529" target="_blank" >10.3390/app12073529</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Time Connection of Subsequent Construction Processes Estimated by Statistical Method

  • Original language description

    An integral part of managing the construction of investment units is the monitoring of labor productivity using statistical methods in combination with construction software. Such a combi-nation includes a number of methods and modeling, among which is a method for determining the probability of the completion of construction processes based on the recorded mean value of labor productivity and its variations. For investment units consisting of two or more objects, it is necessary to assess the probability of the completion of construction processes related to fol-low-up activities and which are carried out by the same work crews. Based on the selected prob-ability modeling, the aim of this contribution was to show how statistical methods and software support can contribute to savings in resources, both human and time, in construction production. The aspect is documented in a case study of residential buildings. The Lindeberg-Lévy and Moi-vre-Laplace theory and the Bernoulli principle were used for mathematical modeling. The CONTEC construction software was applied as the software support. The performed modeling showed a decrease in the mean value of performance for all the processes examined compared to the planned values, except for the implementation of reinforced concrete monolithic structures. For these reasons, the working capacities had to be increased in order to meet construction milestones.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    20102 - Construction engineering, Municipal and structural engineering

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2022

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Applied Sciences

  • ISSN

    2076-3417

  • e-ISSN

    2076-3417

  • Volume of the periodical

    12

  • Issue of the periodical within the volume

    7

  • Country of publishing house

    CH - SWITZERLAND

  • Number of pages

    34

  • Pages from-to

    "nestrankovano"

  • UT code for WoS article

    000781175100001

  • EID of the result in the Scopus database

    2-s2.0-85127937869