Construction Process Duration Predicted by Statistical Method

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F21%3A10248342" target="_blank" >RIV/61989100:27120/21:10248342 - isvavai.cz</a>

  • Result on the web

    <a href="https://iopscience.iop.org/article/10.1088/1757-899X/1203/3/032135/pdf" target="_blank" >https://iopscience.iop.org/article/10.1088/1757-899X/1203/3/032135/pdf</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1088/1757-899X/1203/3/032135" target="_blank" >10.1088/1757-899X/1203/3/032135</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Construction Process Duration Predicted by Statistical Method

  • Original language description

    any construction projects today are planned and managed using computer technology. An integral part of the management of these projects is sophisticated software, which includes statistical probabilistic methods. The main task in this area is direct verification of the validity of planned labour productivity values during the construction process according to the recorded average performance values. Using selected statistical methods and analyses, a case study can document this type of undertaking, for example, in a selected masonry process in which the upper and lower limits of performance, i.e. the optimistic and pessimistic bounds, may be calculated with 95% probability. Evaluation of these performance parameters in the construction software used for this study showed a difference in time of 11 days at the end of the process. The figures indicated a 9.6% and 14.3% decrease in labour productivity, respectively, for the optimistic and pessimistic values compared to the construction software&apos;s planned values. Repeated evaluation of performance can aid in improving labour productivity and attaining project milestones and subsequent construction deadlines during the construction process. This paper aims to confirm or refute this theoretical balance using probabilistic statistical methods and to emphasize the importance of statistical analysis in the real construction process with the use of the software.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2021

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    IOP Conference Series: Materials Science and Engineering. Volume 1203

  • ISBN

  • ISSN

    1757-8981

  • e-ISSN

    1757-899X

  • Number of pages

    18

  • Pages from-to

    1-18

  • Publisher name

    IOP Publishing

  • Place of publication

    Bristol

  • Event location

    Praha

  • Event date

    Jun 14, 2021

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article