Pre-cast concrete, a key option for the reconstruction phase in Syria
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F15%3A00302094" target="_blank" >RIV/68407700:21110/15:00302094 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Pre-cast concrete, a key option for the reconstruction phase in Syria
Original language description
This days Syria is concerned in the development of integrated strategy, starting with a provision of regional, structural and organizational planning for the affected areas, followed by the architectural and construction and environmental studies, etc. This strategy is achieved through the preparation of detailed plans and programs necessary for the implementation of public and private projects that achieve the objective of development and reconstruction. This study includes a range of plans that must overlaps and integrates with each other to produce reconstruction operations. Must be involved in the implementation of these plans work team composed of officials and experts, technicians and consultants, and bound together through a flexible structure composed of a group of sub-committees that are related to higher body for reconstruction. In the stage of the housing plan, researches were done in order to assess the reality of the construction of buildings in Syria, and compared with the concepts and the construction industry characteristics (IBS), and determine the Syrian experiment site regarding to these concepts, as well as evaluating the factors affecting this industry, and proposals to apply it in reconstruction stage. Cast-in-place concrete in the case of the reinforced walls, got 13.1%, while in the case of the framework structure was 34%, and templates tunneling 64%, composite order (pre-cast and Cast-in-place concrete) 61%, composite order (concrete and metallic) 67.25% , and the pre-cast concrete from 82% up to 86%. The questionnaire also shows that the trend towards a modern building industry faces significant challenges in spite of its inevitability as a strategic decision in finding solutions to the problems of housing and reconstruction. The research arranged the priority use of technical systems in construction in Syria, using the method of AHP. The advanced technology system (pre-cast concrete) had the first place with 39.4%.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JN - Civil engineering
OECD FORD branch
—
Result continuities
Project
<a href="/en/project/TD020040" target="_blank" >TD020040: Tools for Technical Economical Support of Activities</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2015
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Construction Maeconomics Conference (2015), Conference Proceedings
ISBN
978-80-01-05845-9
ISSN
—
e-ISSN
—
Number of pages
10
Pages from-to
—
Publisher name
České vysoké učení technické v Praze, Fakulta stavební
Place of publication
Praha
Event location
Praha
Event date
Oct 21, 2015
Type of event by nationality
EUR - Evropská akce
UT code for WoS article
—