Pre-Cast Concrete, a Key Option for the Reconstruction Phase after War
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F17%3A00314195" target="_blank" >RIV/68407700:21110/17:00314195 - isvavai.cz</a>
Result on the web
<a href="https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=17&SID=D5yFV1vDiGvQNa29Pf3&page=1&doc=1" target="_blank" >https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=17&SID=D5yFV1vDiGvQNa29Pf3&page=1&doc=1</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.proeng.2017.08.074" target="_blank" >10.1016/j.proeng.2017.08.074</a>
Alternative languages
Result language
angličtina
Original language name
Pre-Cast Concrete, a Key Option for the Reconstruction Phase after War
Original language description
These days Syria is concerned in the development of integrated strategy, starting with a provision of regional, structural and organizational planning for the affected areas, followed by the architectural and construction and environmental studies, etc. This strategy is achieved through the preparation of detailed plans and programs necessary for the implementation of public and private projects that achieve the objective of development and reconstruction. This study includes a range of plans that must overlaps and integrates with each other to produce reconstruction operations. Work team must be involved in the implementation of these plans. The work team composed of officials and experts, technicians and consultants, and bound together through a flexible structure consisted of a group of sub-committees that are related to a higher body for reconstruction. In the stage of the housing plan, researches were done in order to assess the reality of the construction of buildings in Syria, and compared with the concepts and the construction industry characteristics (IBS), and determine the Syrian experiment site regarding to these concepts, as well as evaluating the factors affecting this industry, and proposals to apply it in reconstruction stage. Cast-in-place concrete in the case of the reinforced walls, got 13.1%, while in the case of the framework structure was 34%, and templates tunnelling was 64%, composite order (pre-cast and Cast-in-place concrete) was 61%, composite order (concrete and metallic) was 67.25% , and the precast concrete was from 82% up to 86%.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2017
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Procedia Engineering
ISBN
—
ISSN
1877-7058
e-ISSN
1877-7058
Number of pages
9
Pages from-to
211-219
Publisher name
Elsevier B.V.
Place of publication
Amsterdam
Event location
Primosten
Event date
Jun 19, 2017
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
000418465300028