All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Pre-Cast Concrete, a Key Option for the Reconstruction Phase after War

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F17%3A00314195" target="_blank" >RIV/68407700:21110/17:00314195 - isvavai.cz</a>

  • Result on the web

    <a href="https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=17&SID=D5yFV1vDiGvQNa29Pf3&page=1&doc=1" target="_blank" >https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=17&SID=D5yFV1vDiGvQNa29Pf3&page=1&doc=1</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.proeng.2017.08.074" target="_blank" >10.1016/j.proeng.2017.08.074</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Pre-Cast Concrete, a Key Option for the Reconstruction Phase after War

  • Original language description

    These days Syria is concerned in the development of integrated strategy, starting with a provision of regional, structural and organizational planning for the affected areas, followed by the architectural and construction and environmental studies, etc. This strategy is achieved through the preparation of detailed plans and programs necessary for the implementation of public and private projects that achieve the objective of development and reconstruction. This study includes a range of plans that must overlaps and integrates with each other to produce reconstruction operations. Work team must be involved in the implementation of these plans. The work team composed of officials and experts, technicians and consultants, and bound together through a flexible structure consisted of a group of sub-committees that are related to a higher body for reconstruction. In the stage of the housing plan, researches were done in order to assess the reality of the construction of buildings in Syria, and compared with the concepts and the construction industry characteristics (IBS), and determine the Syrian experiment site regarding to these concepts, as well as evaluating the factors affecting this industry, and proposals to apply it in reconstruction stage. Cast-in-place concrete in the case of the reinforced walls, got 13.1%, while in the case of the framework structure was 34%, and templates tunnelling was 64%, composite order (pre-cast and Cast-in-place concrete) was 61%, composite order (concrete and metallic) was 67.25% , and the precast concrete was from 82% up to 86%.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2017

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Procedia Engineering

  • ISBN

  • ISSN

    1877-7058

  • e-ISSN

    1877-7058

  • Number of pages

    9

  • Pages from-to

    211-219

  • Publisher name

    Elsevier B.V.

  • Place of publication

    Amsterdam

  • Event location

    Primosten

  • Event date

    Jun 19, 2017

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000418465300028