All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Decision Making in Reconstruction Phase after War

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00311077" target="_blank" >RIV/68407700:21110/16:00311077 - isvavai.cz</a>

  • Result on the web

    <a href="http://2016.creative-construction-conference.com/proceedings/CCC2016_34_Eldin.pdf" target="_blank" >http://2016.creative-construction-conference.com/proceedings/CCC2016_34_Eldin.pdf</a>

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Decision Making in Reconstruction Phase after War

  • Original language description

    Most segments of Syrian society have been affected by the results of the current war, and perhaps the most important and serious result is the unbalanced demographic distribution of the population. Syria is concerned about how to put the integral strategy for the process of reconstruction of the totally and partly destroyed areas. This strategy will be realized by putting plans for the production of an integrated map, which includes an initial perception of all communities within small or medium residential cities, with all commercial, industrial, agricultural and tourist events, rather than regulatory and non-regulatory areas which currently have become destroyed and unfit for restoration and housing. In the stage of the housing plan, researches were done in order to assess the reality of the construction of buildings in Syria, compared with the concepts of the industrial building system (IBS), to evaluate the factors affecting this industry, and proposals of applying it in the reconstruction stage. the results were as following: cast-in-place concrete in the case of the reinforced walls got 13.1%, while in the case of the framework structure it was 34%, and templates tunneling 64%, composite order (pre-cast and Cast-in-place concrete) 61%, composite order (concrete and metallic) 67.25%, and the pre-cast concrete from 82% up to 86%. This research has also arranged the priority use of technical systems in construction in Syria using the method of AHP (Analytic Hierarchy Process), the advanced technology system (pre-cast concrete) was in the first place with 39.4%, with knowledge that it faces significant challenges in spite of its inevitability as a strategic decision in finding solutions to the problems of housing and reconstruction.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JN - Civil engineering

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Creative Construction Conference 2016

  • ISBN

    978-615-5270-24-6

  • ISSN

  • e-ISSN

  • Number of pages

    7

  • Pages from-to

    224-230

  • Publisher name

    Diamond Congress Kft.

  • Place of publication

    Budapest

  • Event location

    Budapest

  • Event date

    Jun 25, 2016

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article