Filtry
Phylogenetic reconstruction and long bone functional morphology in South African hominins (GA25-16018S)
from the U.W. 105 site, which have not yet been systematically described the remains of Homo naledi from the Rising Star cave complex (U.W. 101 and 102 - site and to systematically describe and contextualize hominin remain...
Biology (theoretical, mathematical, thermal, cryobiology, biological rhythm), Evolutionary biology
- 2025 - 2027 •
- 2 890 tis. Kč •
- 2 890 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2025 - 31. 12. 2027
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Increasing the efficiency of plasma aggregates with the aim of their application on foreign markets (EG20_321/0024964)
for current range 30-105 A, and plasma unit designed for machine plasma cutting of metals unit designed for manual plasma cutting of metals for the current range 30-105 A.......
Materials engineering
- 2021 - 2023 •
- 15 567 tis. Kč •
- 0 tis. Kč •
- MPO
Řešení projektu: 15. 1. 2021 - 31. 5. 2023
Uznané náklady
Podpora ze státního rozpočtu (0%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Dynamics of mining subsidence basin and its incidence on mining region (GA105/00/1078)
The proposal of the project has logical contact with the resultes of solved project no. 105/97/0887 "Geodynamic effects in mining subsidence basin based on geodetic measurements "in situ" and its incidence on mining region." It is a continui...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2000 - 2001 •
- 200 tis. Kč •
- 200 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2000 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Maxterra - modern Czech tractor at the power range of 95 - 125 kW. (FR-TI1/022)
The target of the project is to develop and to test the tractor prototypes of Power range 95, 105, 115 and 125 kW and than on Power range 135 and 145 kW, to be able to launch mass production after the technical production planning. The tract...
JO - Pozemní dopravní systémy a zařízení
- 2009 - 2012 •
- 37 313 tis. Kč •
- 9 187 tis. Kč •
- MPO
Řešení projektu: 1. 3. 2009 - 31. 12. 2012
Uznané náklady
Podpora ze státního rozpočtu (25%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Physical geodetic processes in subsidence trough based on geodetic surveyins 'in situ' and their influence on territory affected by coal mining (GA105/97/0887)
Proposed project follows logically with results of solution of Grant project No: 105/931192 "Theory of Subsidence Trough, its Further Stages of Development and its Ecological Consequences in Territory Affected by Coal Mining". We can give th...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1997 - 1998 •
- 280 tis. Kč •
- 280 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 1998
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Standard model of selective coal mining of underground mine from extraction up to its dispatch (GA105/97/1320)
The project continues and develops the results of the grant No. 105/94/1119. The main issue of the project is to solve out the whole process of the extracted material including its preparation and its dispatch. There will be worked out the s...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1997 - 1999 •
- 1 136 tis. Kč •
- 1 136 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 1999
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Control and visualization of information of the technological process of the underground mine (GA105/98/0818)
Gain of this project is to create program system for control and visualization tasks of underground technological processes, which will work in real time (on-line, in-line). (It begins in that state, where GAČR project 105/95/1114 was stoppe...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1998 - 1999 •
- 553 tis. Kč •
- 465 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1998 - 1. 1. 1999
Uznané náklady
Podpora ze státního rozpočtu (84%)
Poskytovatel: Grantová agentura České republiky
Spectroscopy and novel phenomena in complex-doped perovskite-like materials (GA202/00/1425)
enhancement (a=105). The goal of this project is the preparation of high-quality poly...
BM - Fyzika pevných látek a magnetismus
- 2000 - 2002 •
- 2 757 tis. Kč •
- 1 912 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2000 - 1. 1. 2002
Uznané náklady
Podpora ze státního rozpočtu (69%)
Poskytovatel: Grantová agentura České republiky
Interactive program system for application of modern methods of evaluation of coal deposits and their parts at complicated conditions (GA105/03/1417)
(hereafter GAČR) No. 105/00/0194 newly developed graphic method (developed by the same...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2003 - 2005 •
- 2 847 tis. Kč •
- 2 847 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Microstructure and creep strength of advanced heat-resistant steels after long-term exposure (GA106/99/1172)
but increasing rupture times in the range of 104-105 h and (ii) assessing the creep strength...
JG - Hutnictví, kovové materiály
- 1999 - 2001 •
- 1 984 tis. Kč •
- 1 536 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (77%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 z 1 698