Filtry
Transport infrastructure design optimization with respect to increased durability and operation safety (TA03031099)
by the transition zones of bridges. The performance of road bridges is mainly influenced by the design of integral bridges which are known for their bigger endurance and durability. Another solved area is the track-bri...
JM - Inženýrské stavitelství
- 2013 - 2015 •
- 6 956 tis. Kč •
- 4 485 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2013 - 31. 12. 2015
Uznané náklady
Podpora ze státního rozpočtu (64%)
Poskytovatel: Technologická agentura ČR
Effective design, monitoring and forecast of behavior of road prestressed concrete box girder bridges (TA01030733)
road bridges, monitoring of existing bridges and forecast of long term behavior of bridges with excessive deflections caused by creep and relaxation. The new methodology with the help of measured data obtained from several...
JM - Inženýrské stavitelství
- 2011 - 2013 •
- 4 200 tis. Kč •
- 3 300 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2011 - 31. 12. 2013
Uznané náklady
Podpora ze státního rozpočtu (79%)
Poskytovatel: Technologická agentura ČR
Optimization of bridge construction and durability, using new composite solution for UHPC and conventional concrete, mineralized admixtures and secondary materials (CK02000047)
and inspections of bridge structures. The project will also deal with new technological procedures and mechanization in the construction of bridge. The application......
Civil engineering
- 2021 - 2023 •
- 16 822 tis. Kč •
- 12 155 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2021 - 31. 12. 2023
Uznané náklady
Podpora ze státního rozpočtu (72%)
Poskytovatel: Technologická agentura ČR
A concrete bridge health interpretation system based on mutual boost of big data and physical mechanism (TM04000012)
-driven advanced procedures for long-span concrete bridges that will radically improve bridge behavior assessment process, safety, reliability and leads to the optimization for bridge structures utilizing surrogate...
Civil engineering
- 2023 - 2025 •
- 14 064 tis. Kč •
- 10 407 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (74%)
Poskytovatel: Technologická agentura ČR
Ekological and aesthetic composite bridge structures. (FD-K/092)
Develop a structural solution, technology of production and erection of cost effective and ecological composite structures including of realization of a pilot project. Optimization of typical composite structures from the point of view struc...
JN - Stavebnictví
- 2001 - 2003 •
- 10 664 tis. Kč •
- 5 331 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2001 - 1. 1. 2003
Uznané náklady
Podpora ze státního rozpočtu (50%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Specification of residual load-capacity of prestressed bridges (CK01000042)
-bearing structures by operating these bridges using an optimized semi-destructive-bearing capacity of prestressed bridges from the 2nd half of the 20th century. The aim of bridges and thus a reduction in the econo...
Civil engineering
- 2020 - 2023 •
- 16 319 tis. Kč •
- 12 761 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2020 - 31. 12. 2023
Uznané náklady
Podpora ze státního rozpočtu (78%)
Poskytovatel: Technologická agentura ČR
Advanced structural systems of composite structures using prestressing (GA103/99/0734)
The proposal of the grant project is focused on the research of bridge, long-term durability and to keep low maintenance costs. (i) Bridges consists in the choice of optimal structural arrangement including prestressing. (i...
JM - Inženýrské stavitelství
- 1999 - 2001 •
- 2 797 tis. Kč •
- 2 797 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Multichannel Ground Penetrating Radar as a Tool for Monitoring of Road and Bridge Structures (GA103/09/1499)
and bridge defects. Project is focused on design and practical verification of test depth in road bituminous layers and detection of bridge defects. Design), measurements on road test sections, in situ measurements (roads, motorway...
JO - Pozemní dopravní systémy a zařízení
- 2009 - 2011 •
- 2 108 tis. Kč •
- 2 108 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2009 - 31. 12. 2011
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Progressive structure solutions of bridges with respect to modern methods of construction process (TH04020509)
The goal of the project is to develop and analyse progressive structure solutions of bridges with regard to their construction process and to ensure their long-term durability. Developed modern methods of construction of these structures and...
Civil engineering
- 2018 - 2021 •
- 16 137 tis. Kč •
- 9 618 tis. Kč •
- TA ČR
Řešení projektu: 1. 10. 2018 - 31. 12. 2021
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
Development of Methods for increase of Reliability, Load carrying capacity and Life-Cycle Performance of Bridges (GA103/08/1677)
An assessment of lifespan of bridges is a multidisciplinary task where subjects from the fields of structural engineering, computer science and economics have of the optimization. Failure modes, stochastic processes, random variable...
JM - Inženýrské stavitelství
- 2008 - 2010 •
- 3 698 tis. Kč •
- 3 698 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2008 - 31. 12. 2010
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 z 5 424