Studium sítí nových generací založených na hybridních konfiguracích s integrovanými vláknově optickými prvky
Cíle projektu
The NetCom project aims to design new generation networks, such as S-PON (Super-PON), which can increase the scalability and deployment of xPON for access networks. In 2008, a group was created under the IEEE 802.3 Working Group as P802.3cs, which continues to develop this concept under the banner of an international organization, in addition to ITU-T Q2/SG15. This is a development milestone in the field of xPON, and it is based on already established types of xPON networks. The basic attributes of the previous types of PON networks are combined here. Still, with the fact, the new S-PON architecture tries to achieve a range of up to 50 km with customer coverage of up to 1024 end units within a passive optical distribution network. To achieve such a large coverage of subscribers within the S-PON network, it is necessary to use a suitable wave plan for all end customers/units. For this, integrated waveguide optic elements based on the AWG are used, especially C-AWG (Cyclic AWG) or A-AWG (Athermal AWG) if part of the network is installed in outdoor environments. By choosing the right wave plan, we can cover the channel spacing at 100 GHz within the C and L optical bands and achieve coexistence with other types of networks, such as XGS-PON/NGPON.
Klíčová slova
Arrayed waveguide gratingsphotonicspassive optical componentsAWG designoptical networks
Veřejná podpora
Poskytovatel
Ministerstvo školství, mládeže a tělovýchovy
Program
Program pro financování projektů mnohostranné vědeckotechnické spolupráce v Podunajském regionu
Veřejná soutěž
—
Hlavní účastníci
Vysoká škola báňská - Technická univerzita Ostrava / Fakulta elektrotechniky a informatiky
Druh soutěže
M2 - Mezinárodní spolupráce
Číslo smlouvy
-
Alternativní jazyk
Název projektu anglicky
New generation networks based on hybrid configuration with integrated passive optical components (NetCom)
Anotace anglicky
The NetCom project aims to design new generation networks, such as S-PON (Super-PON), which can increase the scalability and deployment of xPON for access networks. In 2008, a group was created under the IEEE 802.3 Working Group as P802.3cs, which continues to develop this concept under the banner of an international organization, in addition to ITU-T Q2/SG15. This is a development milestone in the field of xPON, and it is based on already established types of xPON networks. The basic attributes of the previous types of PON networks are combined here. Still, with the fact, the new S-PON architecture tries to achieve a range of up to 50 km with customer coverage of up to 1024 end units within a passive optical distribution network. To achieve such a large coverage of subscribers within the S-PON network, it is necessary to use a suitable wave plan for all end customers/units. For this, integrated waveguide optic elements based on the AWG are used, especially C-AWG (Cyclic AWG) or A-AWG (Athermal AWG) if part of the network is installed in outdoor environments. By choosing the right wave plan, we can cover the channel spacing at 100 GHz within the C and L optical bands and achieve coexistence with other types of networks, such as XGS-PON/NGPON.
Vědní obory
Kategorie VaV
ZV - Základní výzkum
OECD FORD - hlavní obor
20201 - Electrical and electronic engineering
OECD FORD - vedlejší obor
—
OECD FORD - další vedlejší obor
—
CEP - odpovídající obory
(dle převodníku)JA - Elektronika a optoelektronika, elektrotechnika
JB - Senzory, čidla, měření a regulace
Termíny řešení
Zahájení řešení
1. 7. 2023
Ukončení řešení
30. 6. 2025
Poslední stav řešení
K - Končící víceletý projekt
Poslední uvolnění podpory
14. 2. 2025
Dodání dat do CEP
Důvěrnost údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Systémové označení dodávky dat
CEP25-MSM-8X-R
Datum dodání záznamu
5. 3. 2025
Finance
Celkové uznané náklady
249 tis. Kč
Výše podpory ze státního rozpočtu
249 tis. Kč
Ostatní veřejné zdroje financování
0 tis. Kč
Neveřejné tuz. a zahr. zdroje finan.
0 tis. Kč
Základní informace
Uznané náklady
249 tis. Kč
Statní podpora
249 tis. Kč
100%
Poskytovatel
Ministerstvo školství, mládeže a tělovýchovy
OECD FORD
Electrical and electronic engineering
Doba řešení
01. 07. 2023 - 30. 06. 2025