Delivery methods under FIDIC forms of contract
Popis výsledku v původním jazyce
A Construction and Engineering industry is a high risk industry. Management of the risks has overridingimportance and every risk must be allocated to one or other party. Practice over many years has shownthat sensible and balanced risk allocation resultsin the lowest overall total cost for completed projects.Common delivery methods such as General Contracting or Design-Bid-Build (often abbreviated as D/B/B),Design-Build (often abbreviated as D/B) including EPC (Engineer-Procure-Construct), and Construction Management (often abbreviated as CM), including CM At-Risk and EPCM (Engineer-Procure-ConstructionManagement) and their key aspects such as Contract Price, Design Responsibility and Contract Administrationcreate a basis of Risk Allocation.Claim Management is a system for early solution of problems, obstructions and complications that helpsreflect realized risk in Contract price and in Time for Completion.The Fédération Internationale des Ingénieurs-Conseils (International Federation
Název v anglickém jazyce
Delivery methods under FIDIC forms of contract
Popis výsledku anglicky
A Construction and Engineering industry is a high risk industry. Management of the risks has overridingimportance and every risk must be allocated to one or other party. Practice over many years has shownthat sensible and balanced risk allocation resultsin the lowest overall total cost for completed projects.Common delivery methods such as General Contracting or Design-Bid-Build (often abbreviated as D/B/B),Design-Build (often abbreviated as D/B) including EPC (Engineer-Procure-Construct), and Construction Management (often abbreviated as CM), including CM At-Risk and EPCM (Engineer-Procure-ConstructionManagement) and their key aspects such as Contract Price, Design Responsibility and Contract Administrationcreate a basis of Risk Allocation.Claim Management is a system for early solution of problems, obstructions and complications that helpsreflect realized risk in Contract price and in Time for Completion.The Fédération Internationale des Ingénieurs-Conseils (International Federation
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
AG - Právní vědy
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
The Lawyer Quarterly: International Journal for Legal Research
ISSN
1805-8396
e-ISSN
—
Svazek periodika
3
Číslo periodika v rámci svazku
2
Stát vydavatele periodika
CZ - Česká republika
Počet stran výsledku
5
Strana od-do
164-168
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—