Uvažování o čase v zahnízděných temporálních sítích s alternativami
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11320%2F08%3A00100903" target="_blank" >RIV/00216208:11320/08:00100903 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Temporal Reasoning in Nested Temporal Networks with Alternatives
Popis výsledku v původním jazyce
Temporal networks play a crucial role in modeling temporal relations in planning and scheduling applications. Temporal Networks with Alternatives (TNAs) were proposed to model alternative and parallel processes in production scheduling, however the problem of deciding which nodes can be consistently included in such networks is NP-complete. A tractable subclass, called Nested TNAs, can still cover a wide range of real-life processes, while the problem of deciding node validity is solvable in polynomialtime. In this paper, we show that adding simple temporal constraints (instead of precedence relations) to Nested TNAs makes the problem NP-hard again. We also present several complete and incomplete techniques for temporal reasoning in Nested TNAs.
Název v anglickém jazyce
Temporal Reasoning in Nested Temporal Networks with Alternatives
Popis výsledku anglicky
Temporal networks play a crucial role in modeling temporal relations in planning and scheduling applications. Temporal Networks with Alternatives (TNAs) were proposed to model alternative and parallel processes in production scheduling, however the problem of deciding which nodes can be consistently included in such networks is NP-complete. A tractable subclass, called Nested TNAs, can still cover a wide range of real-life processes, while the problem of deciding node validity is solvable in polynomialtime. In this paper, we show that adding simple temporal constraints (instead of precedence relations) to Nested TNAs makes the problem NP-hard again. We also present several complete and incomplete techniques for temporal reasoning in Nested TNAs.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JC - Počítačový hardware a software
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2008
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Znalosti 2008
ISBN
978-80-227-2827-0
ISSN
—
e-ISSN
—
Počet stran výsledku
12
Strana od-do
—
Název nakladatele
Vydavatelstvo Slovenskej technickej univerzity
Místo vydání
Bratislava
Místo konání akce
Bratislava
Datum konání akce
1. 1. 2008
Typ akce podle státní příslušnosti
CST - Celostátní akce
Kód UT WoS článku
—