Interlock system for the COMPASS tokamak
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11320%2F10%3A10080574" target="_blank" >RIV/00216208:11320/10:10080574 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/61389021:_____/10:00349232 RIV/68407700:21230/10:00178588
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Interlock system for the COMPASS tokamak
Popis výsledku v původním jazyce
An important issue of the operation is the interlock system, which secures the safety of the personnel. The personnel protection is based on a restricted access into the experimental hall during the tokamak operation. An experimental hall access system,based on Honeywell WIN-PAKTM2005, allows to set the status of the experimental area and to control the movement of the personnel. A hardware interlock, based on a PLC MicroPEL M66, interprets the experimental hall status and controls the safety of the operation of key systems accordingly. The permit for operation is granted and the real status of the systems is reported by hard-wired potential-less contacts. The PLC provides a HW interface between Actuators (relays and switches) and it is connected on PESNET bus. Second site of personnel protection system is created on a PC where runs a .NET application on MS Windows XP. This PC is connected with PLC via PESNET bus (on RS485 layer) and it creates an operator interface.
Název v anglickém jazyce
Interlock system for the COMPASS tokamak
Popis výsledku anglicky
An important issue of the operation is the interlock system, which secures the safety of the personnel. The personnel protection is based on a restricted access into the experimental hall during the tokamak operation. An experimental hall access system,based on Honeywell WIN-PAKTM2005, allows to set the status of the experimental area and to control the movement of the personnel. A hardware interlock, based on a PLC MicroPEL M66, interprets the experimental hall status and controls the safety of the operation of key systems accordingly. The permit for operation is granted and the real status of the systems is reported by hard-wired potential-less contacts. The PLC provides a HW interface between Actuators (relays and switches) and it is connected on PESNET bus. Second site of personnel protection system is created on a PC where runs a .NET application on MS Windows XP. This PC is connected with PLC via PESNET bus (on RS485 layer) and it creates an operator interface.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
BL - Fyzika plasmatu a výboje v plynech
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2010
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Fusion Engineering and Design
ISSN
0920-3796
e-ISSN
—
Svazek periodika
85
Číslo periodika v rámci svazku
3-4
Stát vydavatele periodika
NL - Nizozemsko
Počet stran výsledku
4
Strana od-do
—
Kód UT WoS článku
000281190000051
EID výsledku v databázi Scopus
—