The Belle II vertex detector integration
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11320%2F19%3A10407942" target="_blank" >RIV/00216208:11320/19:10407942 - isvavai.cz</a>
Výsledek na webu
<a href="https://verso.is.cuni.cz/pub/verso.fpl?fname=obd_publikace_handle&handle=vMYEjgx_qa" target="_blank" >https://verso.is.cuni.cz/pub/verso.fpl?fname=obd_publikace_handle&handle=vMYEjgx_qa</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.nima.2018.09.003" target="_blank" >10.1016/j.nima.2018.09.003</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Belle II vertex detector integration
Popis výsledku v původním jazyce
The Belle II experiment comes with a substantial upgrade of the Belle detector and will operate at the SuperKEKB energy-asymmetric e(+)e(-) collider with energies tuned to Y(4S) resonance root s = 10.588 GeV. The accelerator has successfully completed the first phase of commissioning in 2016 and the first electron-positron collisions in Belle II took place in April 2018. Belle II features a newly designed silicon vertex detector based on DEPFET pixel and double-sided strip layers. Currently, a subset of the vertex detector is installed (Phase 2 of the experiment). Installation of the full detector (Phase 3) will be completed by the end of 2018. This paper describes the Phase 2 arrangement of the Belle II silicon vertex detector, with focus on the interconnection of detectors and their integration with the software framework of Belle II. Alignment issues are discussed based on detector simulations and first acquired data.
Název v anglickém jazyce
The Belle II vertex detector integration
Popis výsledku anglicky
The Belle II experiment comes with a substantial upgrade of the Belle detector and will operate at the SuperKEKB energy-asymmetric e(+)e(-) collider with energies tuned to Y(4S) resonance root s = 10.588 GeV. The accelerator has successfully completed the first phase of commissioning in 2016 and the first electron-positron collisions in Belle II took place in April 2018. Belle II features a newly designed silicon vertex detector based on DEPFET pixel and double-sided strip layers. Currently, a subset of the vertex detector is installed (Phase 2 of the experiment). Installation of the full detector (Phase 3) will be completed by the end of 2018. This paper describes the Phase 2 arrangement of the Belle II silicon vertex detector, with focus on the interconnection of detectors and their integration with the software framework of Belle II. Alignment issues are discussed based on detector simulations and first acquired data.
Klasifikace
Druh
J<sub>imp</sub> - Článek v periodiku v databázi Web of Science
CEP obor
—
OECD FORD obor
10303 - Particles and field physics
Návaznosti výsledku
Projekt
<a href="/cs/project/LTT17020" target="_blank" >LTT17020: Studium fyziky za standardním modelem v mezinárodním experimentu Belle II v Japonsku</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>S - Specificky vyzkum na vysokych skolach<br>I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Nuclear Instruments & Methods in Physics Research. Section A: Accelerators, Spectrometers, Detectors, and Associated Equipment
ISSN
0168-9002
e-ISSN
—
Svazek periodika
936
Číslo periodika v rámci svazku
21 August 2019
Stát vydavatele periodika
NL - Nizozemsko
Počet stran výsledku
5
Strana od-do
616-620
Kód UT WoS článku
000471828100232
EID výsledku v databázi Scopus
2-s2.0-85053372170