Simulační projekty zaměřené na studium seřaďovacích stanic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216275%3A25510%2F03%3A00000332" target="_blank" >RIV/00216275:25510/03:00000332 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
čeština
Název v původním jazyce
Simulační projekty zaměřené na studium seřaďovacích stanic
Popis výsledku v původním jazyce
The operation of marshalling yard represents the important part of the whole operation of railway freight traffic system. The quality of marshalling yard operation depends mainly on: - the organisation of technological processes within the station, -thenumber and structure of yard mobile resources (personnel and shunting locomotives), -technical station equipment (i.e. track infrastructure, signalling and interlocking system, automation devices etc.). It is essential to investigate the acting of yard surroundings (determined by the current rates and composition of incoming train flows) and evaluate the feasibility of meeting defined yard tasks. Proposing suitable measures, realisation of which leads to improving of yard operation quality, i s connected with optimisation problem of searching (if possible) the best yard operation variant under the defined conditions. Because of high complexity level of marshalling yard system, the experimental method of computer simulation represents th
Název v anglickém jazyce
Simulation Projects Focused on the Marshalling Yard Inestigation
Popis výsledku anglicky
The operation of marshalling yard represents the important part of the whole operation of railway freight traffic system. The quality of marshalling yard operation depends mainly on: - the organisation of technological processes within the station, -thenumber and structure of yard mobile resources (personnel and shunting locomotives), -technical station equipment (i.e. track infrastructure, signalling and interlocking system, automation devices etc.). It is essential to investigate the acting of yard surroundings (determined by the current rates and composition of incoming train flows) and evaluate the feasibility of meeting defined yard tasks. Proposing suitable measures, realisation of which leads to improving of yard operation quality, i s connected with optimisation problem of searching (if possible) the best yard operation variant under the defined conditions. Because of high complexity level of marshalling yard system, the experimental method of computer simulation represents th
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JC - Počítačový hardware a software
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2003
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
2. mezinárodní konference informačních technologií v dopravě - INFOTRANS 2003
ISBN
80-7194-530-7
ISSN
—
e-ISSN
—
Počet stran výsledku
222
Strana od-do
86-100
Název nakladatele
Univerzita Pardubice, Dopravní fakulta Jana Pernera
Místo vydání
Pardubice
Místo konání akce
Pardubice
Datum konání akce
12. 2. 2003
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—