Curved cable stayed and suspension pedestrian bridges
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F11%3APU92973" target="_blank" >RIV/00216305:26110/11:PU92973 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Curved cable stayed and suspension pedestrian bridges
Popis výsledku v původním jazyce
Curved cable stayed and suspension bridges are studied in the terms of the architectural and structural solution, and static and dynamic behaviour. The function of these structures is being verified on a static model built in the scale 1:10. The studiedstructures are formed by curved concrete bands that are stiffened by steel pipes on their inner edges. The bridges of the span of 60 m are in a plan curvature that in pathways axis have a radius of 32 m. Both the concrete band and the steel pipes are fixed into the anchor blocks. The external cables that are situated in the handrail pipe balance the dead load torsional moment. The paper will describe the studied structures, results of the analysis and the model testing.
Název v anglickém jazyce
Curved cable stayed and suspension pedestrian bridges
Popis výsledku anglicky
Curved cable stayed and suspension bridges are studied in the terms of the architectural and structural solution, and static and dynamic behaviour. The function of these structures is being verified on a static model built in the scale 1:10. The studiedstructures are formed by curved concrete bands that are stiffened by steel pipes on their inner edges. The bridges of the span of 60 m are in a plan curvature that in pathways axis have a radius of 32 m. Both the concrete band and the steel pipes are fixed into the anchor blocks. The external cables that are situated in the handrail pipe balance the dead load torsional moment. The paper will describe the studied structures, results of the analysis and the model testing.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/FI-IM5%2F128" target="_blank" >FI-IM5/128: Progresivní konstrukce z vysokohodnotného betonu</a><br>
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2011
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů