Structural Design of Newly Developed Temporary Footbridge
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F13%3APU105367" target="_blank" >RIV/00216305:26110/13:PU105367 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.4028/www.scientific.net/AMM.405-408.1623" target="_blank" >http://dx.doi.org/10.4028/www.scientific.net/AMM.405-408.1623</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.4028/www.scientific.net/AMM.405-408.1623" target="_blank" >10.4028/www.scientific.net/AMM.405-408.1623</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Structural Design of Newly Developed Temporary Footbridge
Popis výsledku v původním jazyce
The paper deals with the design of steel structure of the temporary footbridge, intended especially for the usage in the construction site for pedestrian and bicycle traffic. In the period of last two years, on the author workplace, in the co-operation with the mounting company, the new type of steel footbridge is being developed. Within this development the attention is, among others, paid to the structural design, in particular to the harmonization of static solution and structural detailing, to achieve the efficient design. In the course of solving this problem, two types of the footbridge are being developed in parallel. Both footbridges are composed as the structures with a lower deck, truss main girders and bracings; the first structure (short footbridge) with a small self weight may have the span up to 18 m; the second structure (long footbridge) with a normal self weight may have the span up to 36 m. The paper is focused on the brief description of structural composition and pa
Název v anglickém jazyce
Structural Design of Newly Developed Temporary Footbridge
Popis výsledku anglicky
The paper deals with the design of steel structure of the temporary footbridge, intended especially for the usage in the construction site for pedestrian and bicycle traffic. In the period of last two years, on the author workplace, in the co-operation with the mounting company, the new type of steel footbridge is being developed. Within this development the attention is, among others, paid to the structural design, in particular to the harmonization of static solution and structural detailing, to achieve the efficient design. In the course of solving this problem, two types of the footbridge are being developed in parallel. Both footbridges are composed as the structures with a lower deck, truss main girders and bracings; the first structure (short footbridge) with a small self weight may have the span up to 18 m; the second structure (long footbridge) with a normal self weight may have the span up to 36 m. The paper is focused on the brief description of structural composition and pa
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Applied Mechanics and Materials
ISSN
1660-9336
e-ISSN
—
Svazek periodika
2013
Číslo periodika v rámci svazku
405-408
Stát vydavatele periodika
CH - Švýcarská konfederace
Počet stran výsledku
4
Strana od-do
1623-1626
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—