The effective cross-section thickness and its effect on shrinkage
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F14%3APU113303" target="_blank" >RIV/00216305:26110/14:PU113303 - isvavai.cz</a>
Výsledek na webu
<a href="https://www.scientific.net/AMR.1106.168" target="_blank" >https://www.scientific.net/AMR.1106.168</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.4028/www.scientific.net/AMR.1106.168" target="_blank" >10.4028/www.scientific.net/AMR.1106.168</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The effective cross-section thickness and its effect on shrinkage
Popis výsledku v původním jazyce
In concrete structures such as bridges or tanks, hydro insulation is applied several months after the actual construction of the structure itself. Concrete structures dry during part of their lifespan throughout the entire area of their structure. After hydro insulation is applied, drying is affected and it does not occur as it would under normal conditions. This change in drying conditions can eventually lead to changes in the structural behaviour of the structure e.g. bridges or tanks. Current computing programmes for time dependent analysis of the structure do not allow to take into consideration the above mentioned conditions while drying takes place, thus leading to static analysis inaccuracies [2]. The aim of this research is to experimentally demonstrate shrinkage as a result of the difference in drying of the concrete structural elements cross-section and their basic comparison with the calculations according to different standards.
Název v anglickém jazyce
The effective cross-section thickness and its effect on shrinkage
Popis výsledku anglicky
In concrete structures such as bridges or tanks, hydro insulation is applied several months after the actual construction of the structure itself. Concrete structures dry during part of their lifespan throughout the entire area of their structure. After hydro insulation is applied, drying is affected and it does not occur as it would under normal conditions. This change in drying conditions can eventually lead to changes in the structural behaviour of the structure e.g. bridges or tanks. Current computing programmes for time dependent analysis of the structure do not allow to take into consideration the above mentioned conditions while drying takes place, thus leading to static analysis inaccuracies [2]. The aim of this research is to experimentally demonstrate shrinkage as a result of the difference in drying of the concrete structural elements cross-section and their basic comparison with the calculations according to different standards.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings from 21st Czech Concrete Day 2014
ISBN
978-3-03835-474-1
ISSN
1022-6680
e-ISSN
1662-8985
Počet stran výsledku
4
Strana od-do
168-171
Název nakladatele
Trans Tech Publications Ltd, Churerstrasse 20, CH-8808 Pfaffikon, Switzerland
Místo vydání
Switzerland
Místo konání akce
Hradec Králové
Datum konání akce
26. 11. 2014
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—