The conflicts in flood routing through the recreational reservoir Hostivař in Prague
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F15%3APU114053" target="_blank" >RIV/00216305:26110/15:PU114053 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The conflicts in flood routing through the recreational reservoir Hostivař in Prague
Popis výsledku v původním jazyce
The main purpose of the Hostivař dam in prague is recreation when the reservoir level has to be maintained on prescribed level. The second declared purpose of the schema is flood attenuation at which operational manual recommends to pre-empty the reservoir. Obviously these reqirementssuffer from centain inconsistency in manipulation with water level. During the flood in June 2013 with approximate return period of 500 years several facilities downstream of the dam were flooded byrelatively rapid increase of water level in the Botič stream downstream of the Hostivař dam in Prague. The blame was thrown on the improper manipulation with appurtenant works of the dam and the complaints insist on the flood attenuation effect declared in operation manual. the study on the correctness of the operation at the during the flood proved proper and optimal operation with only minor flood attenuation effect.The main declared purpose-recreation.does not allow significant preemptying of the reservoir which has only limited volume to attenuate more extreme flood discharges.
Název v anglickém jazyce
The conflicts in flood routing through the recreational reservoir Hostivař in Prague
Popis výsledku anglicky
The main purpose of the Hostivař dam in prague is recreation when the reservoir level has to be maintained on prescribed level. The second declared purpose of the schema is flood attenuation at which operational manual recommends to pre-empty the reservoir. Obviously these reqirementssuffer from centain inconsistency in manipulation with water level. During the flood in June 2013 with approximate return period of 500 years several facilities downstream of the dam were flooded byrelatively rapid increase of water level in the Botič stream downstream of the Hostivař dam in Prague. The blame was thrown on the improper manipulation with appurtenant works of the dam and the complaints insist on the flood attenuation effect declared in operation manual. the study on the correctness of the operation at the during the flood proved proper and optimal operation with only minor flood attenuation effect.The main declared purpose-recreation.does not allow significant preemptying of the reservoir which has only limited volume to attenuate more extreme flood discharges.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/TA02020386" target="_blank" >TA02020386: Užití metod vsakování a jejich vyhodnocování v návaznosti na porovnávání výsledků s laboratorními zkouškami na různých typech zemin a model pro návrh vsakovacích jímek.</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2015
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Public recreation and landscape protection - with man hand in hand!
ISBN
978-80-7509-251-9
ISSN
—
e-ISSN
—
Počet stran výsledku
5
Strana od-do
242-246
Název nakladatele
Astron studio CZ, Praha
Místo vydání
Brno
Místo konání akce
Brno
Datum konání akce
3. 5. 2015
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
000379410300051