Experimental verification of properties of concrete mixtures for concrete prefabricated elements
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F18%3APU132710" target="_blank" >RIV/00216305:26110/18:PU132710 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Experimental verification of properties of concrete mixtures for concrete prefabricated elements
Popis výsledku v původním jazyce
Manipulation with concrete prefabricate usually takes place soon after the concreting. Concrete mixtures for the production of concrete prefabricated elements shall, in addition to requirements for the resulting concrete strength, also meet the requirements for concrete handling strength. The required handling strength of the concrete shall normally be achieved at 18 hours after concreting. Concrete compressive strength, tensile strength and modulus of elasticity at the time of 18 hours, 42 hours, 66 hours, 14 days, and 28 days, were measured during the experiment. Furthermore, the shrinkage of the concrete was measured over time of 1 day, 3 days, 7 days, 36 days, 68 days, and 91 days in 4 blocks of 75 mm, 125 mm, 150 mm, and 200 mm thickness. © 2019 Taylor & Francis Group, London.
Název v anglickém jazyce
Experimental verification of properties of concrete mixtures for concrete prefabricated elements
Popis výsledku anglicky
Manipulation with concrete prefabricate usually takes place soon after the concreting. Concrete mixtures for the production of concrete prefabricated elements shall, in addition to requirements for the resulting concrete strength, also meet the requirements for concrete handling strength. The required handling strength of the concrete shall normally be achieved at 18 hours after concreting. Concrete compressive strength, tensile strength and modulus of elasticity at the time of 18 hours, 42 hours, 66 hours, 14 days, and 28 days, were measured during the experiment. Furthermore, the shrinkage of the concrete was measured over time of 1 day, 3 days, 7 days, 36 days, 68 days, and 91 days in 4 blocks of 75 mm, 125 mm, 150 mm, and 200 mm thickness. © 2019 Taylor & Francis Group, London.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/TH03020446" target="_blank" >TH03020446: Vývoj dispozičně variabilnější panelové soustavy pro bytové domy</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2018
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Advanses and Trends in Engineering Sciences and Technologies III
ISBN
978-0-367-07509-5
ISSN
—
e-ISSN
—
Počet stran výsledku
5
Strana od-do
113-118
Název nakladatele
CRC Press/Balkema Taylor & Trancis Group. London, UK
Místo vydání
London IK
Místo konání akce
Tatranské Matliare
Datum konání akce
12. 9. 2018
Typ akce podle státní příslušnosti
WRD - Celosvětová akce