Differences in the Cost Calculation for Construction Work, RoadTransport and Water Supply
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F19%3APU133323" target="_blank" >RIV/00216305:26110/19:PU133323 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21260/19:00355573
Výsledek na webu
<a href="http://dx.doi.org/10.1088/1757-899X/603/3/032086" target="_blank" >http://dx.doi.org/10.1088/1757-899X/603/3/032086</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1757-899X/603/3/032086" target="_blank" >10.1088/1757-899X/603/3/032086</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Differences in the Cost Calculation for Construction Work, RoadTransport and Water Supply
Popis výsledku v původním jazyce
This paper presents a method of cost and price calculation of construction work, road transport and water and sewerage chargesin the Czech Republic. Costs represent animportant economic category that is closely related to theprice. Each companymust perfectly manage costing, especially absorption costing, which consists ofbudgeting overhead costs on theproduction (performance, products and services). Absorption costing is characterizedbyincludingindirect (overhead) costs together with direct costs of production into the calculation, i.e. it must absorb them completely into the costs. The absorption method is represented by thesurcharge calculation. However, creating the calculation formula for absorption costing and the procedure ofcost and price calculation have theirspecifics in various branches of theeconomy. Differences can be seen in examples of selected case studies. They deal with therepresentative cost and price calculation of construction work on a particular construction, cost and price calculation of theroad transport and one-component and two-component cost and price calculation of the water and sewerage charges. All types of calculation must reflect the economic situation of the company marketing of a new product. The diversity of the product types mentioned above indicates the need for otherinputs in the calculation and differentcalculation procedures. Without mastering absor ption costing, it is not possible to introduce more accurate calculation methods, such as the Dynamic Calculation with Contribution Margin or in the next step implement the Balanced Scorecard. Correct absorption costingcan be checked by the fact that the sum of all company production costs must correspond to the sum of the financial accounting cost accounts. However, cost control is not the subject of this article.
Název v anglickém jazyce
Differences in the Cost Calculation for Construction Work, RoadTransport and Water Supply
Popis výsledku anglicky
This paper presents a method of cost and price calculation of construction work, road transport and water and sewerage chargesin the Czech Republic. Costs represent animportant economic category that is closely related to theprice. Each companymust perfectly manage costing, especially absorption costing, which consists ofbudgeting overhead costs on theproduction (performance, products and services). Absorption costing is characterizedbyincludingindirect (overhead) costs together with direct costs of production into the calculation, i.e. it must absorb them completely into the costs. The absorption method is represented by thesurcharge calculation. However, creating the calculation formula for absorption costing and the procedure ofcost and price calculation have theirspecifics in various branches of theeconomy. Differences can be seen in examples of selected case studies. They deal with therepresentative cost and price calculation of construction work on a particular construction, cost and price calculation of theroad transport and one-component and two-component cost and price calculation of the water and sewerage charges. All types of calculation must reflect the economic situation of the company marketing of a new product. The diversity of the product types mentioned above indicates the need for otherinputs in the calculation and differentcalculation procedures. Without mastering absor ption costing, it is not possible to introduce more accurate calculation methods, such as the Dynamic Calculation with Contribution Margin or in the next step implement the Balanced Scorecard. Correct absorption costingcan be checked by the fact that the sum of all company production costs must correspond to the sum of the financial accounting cost accounts. However, cost control is not the subject of this article.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20104 - Transport engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
4th World Multidisciplinary Civil Engineering - Architecture - Urban Planning Symposium
ISBN
—
ISSN
1757-8981
e-ISSN
—
Počet stran výsledku
9
Strana od-do
1-9
Název nakladatele
IOP Conference Series
Místo vydání
UK
Místo konání akce
Praha
Datum konání akce
17. 6. 2019
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000562099101097