Three-dimensions modelling of a jet pile construction in the Karolinka dam
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F19%3APU136321" target="_blank" >RIV/00216305:26110/19:PU136321 - isvavai.cz</a>
Výsledek na webu
<a href="https://acta.mendelu.cz/67/3/0637/" target="_blank" >https://acta.mendelu.cz/67/3/0637/</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.11118/actaun201967030637" target="_blank" >10.11118/actaun201967030637</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Three-dimensions modelling of a jet pile construction in the Karolinka dam
Popis výsledku v původním jazyce
Karolinka Earth Fill dam was built on the Stanovnice river above the town of Karolinka in the region of Vsetín. Because of leakage on the downstream dam face due to bad compacting of soil during the construction stage, the reservoir was used to a limited level. There were some steps to improve safety which had been developed to reconstruct the dam after extensive surveys in 2005. The major rehabilitation was commenced in period from September 2012 till October 2013, included the remediation of central impervious core in the dam by using the diaphragm wall (I also have worked on) and jet grouting pile from self‑hardening cement‑bentonite suspension. The article presents three‑dimensional modelling of a jet pile construction, by using finite element method which is performed by Plaxis program. It is concluded that real data shows good agreement with the computed result obtained by the FEM analysis.
Název v anglickém jazyce
Three-dimensions modelling of a jet pile construction in the Karolinka dam
Popis výsledku anglicky
Karolinka Earth Fill dam was built on the Stanovnice river above the town of Karolinka in the region of Vsetín. Because of leakage on the downstream dam face due to bad compacting of soil during the construction stage, the reservoir was used to a limited level. There were some steps to improve safety which had been developed to reconstruct the dam after extensive surveys in 2005. The major rehabilitation was commenced in period from September 2012 till October 2013, included the remediation of central impervious core in the dam by using the diaphragm wall (I also have worked on) and jet grouting pile from self‑hardening cement‑bentonite suspension. The article presents three‑dimensional modelling of a jet pile construction, by using finite element method which is performed by Plaxis program. It is concluded that real data shows good agreement with the computed result obtained by the FEM analysis.
Klasifikace
Druh
J<sub>SC</sub> - Článek v periodiku v databázi SCOPUS
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Acta Universitatis Agriculturae et Silviculturae Mendelianae Brunensis
ISSN
1211-8516
e-ISSN
2464-8310
Svazek periodika
67
Číslo periodika v rámci svazku
3
Stát vydavatele periodika
CZ - Česká republika
Počet stran výsledku
12
Strana od-do
637-648