Designing the operating rules of a reservoir to maximise the financial revenue from a hydropower plant: Case study of Mostiste, Czech Republic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F20%3APU139441" target="_blank" >RIV/00216305:26110/20:PU139441 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.5593/sgem2020V/1.3/s02.13" target="_blank" >http://dx.doi.org/10.5593/sgem2020V/1.3/s02.13</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.5593/sgem2020V/1.3/s02.13" target="_blank" >10.5593/sgem2020V/1.3/s02.13</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Designing the operating rules of a reservoir to maximise the financial revenue from a hydropower plant: Case study of Mostiste, Czech Republic
Popis výsledku v původním jazyce
In this paper, the principle of the pumped storage hydropower plant is applied to the single reservoir with the run-to-river hydropower plant. The water accumulation in the upper reservoir is substituted with the operating rules, which increase and decrease the discharges from the reservoir with relation to the electricity price on the market in order to the high-price revenue. Designed operating rules decrease the discharges from the reservoir in the period of low market electricity market price and conversely increase the discharges in the period of high market electricity market price. This leads to use the accumulated water from the low-price periods in the high-price periods. Microsoft Excel was used to develop the operating rules and via this software the analysis of the time series of the electricity market price and two simulation models were made.
Název v anglickém jazyce
Designing the operating rules of a reservoir to maximise the financial revenue from a hydropower plant: Case study of Mostiste, Czech Republic
Popis výsledku anglicky
In this paper, the principle of the pumped storage hydropower plant is applied to the single reservoir with the run-to-river hydropower plant. The water accumulation in the upper reservoir is substituted with the operating rules, which increase and decrease the discharges from the reservoir with relation to the electricity price on the market in order to the high-price revenue. Designed operating rules decrease the discharges from the reservoir in the period of low market electricity market price and conversely increase the discharges in the period of high market electricity market price. This leads to use the accumulated water from the low-price periods in the high-price periods. Microsoft Excel was used to develop the operating rules and via this software the analysis of the time series of the electricity market price and two simulation models were made.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
10503 - Water resources
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2020
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
20th International Multidisciplinary Scientific GeoConference
ISBN
978-619-7603-17-0
ISSN
1314-2704
e-ISSN
—
Počet stran výsledku
8
Strana od-do
103-112
Název nakladatele
Neuveden
Místo vydání
Neuveden
Místo konání akce
Vídeň
Datum konání akce
8. 12. 2020
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—