Analysis of the Reconstruction of a Green Roof on a Multifunctional Building in Brno
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F22%3APU147026" target="_blank" >RIV/00216305:26110/22:PU147026 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Analysis of the Reconstruction of a Green Roof on a Multifunctional Building in Brno
Popis výsledku v původním jazyce
The article analyzes construction-technological processes during the reconstruction of green roofs on a multifunctional building in Brno. The reason for the reconstruction was the insufficient thickness of the substrate and the absence of a hydroaccumulation layer that would ensure better growth of vegetation. First, the original layers of substrate and vegetation were removed and the existing geotextiles and waterproofing were inspected. Subsequently, a pre-designed new roof composition with a hydroaccumulation layer and a larger layer of substrate for better vegetation growth was installed on the roof. During the reconstruction process, a time-lapse camera was located on the roof, recording the time spent by workers removing the original material, transporting new materials to the roof, and the time of subsequent storage.
Název v anglickém jazyce
Analysis of the Reconstruction of a Green Roof on a Multifunctional Building in Brno
Popis výsledku anglicky
The article analyzes construction-technological processes during the reconstruction of green roofs on a multifunctional building in Brno. The reason for the reconstruction was the insufficient thickness of the substrate and the absence of a hydroaccumulation layer that would ensure better growth of vegetation. First, the original layers of substrate and vegetation were removed and the existing geotextiles and waterproofing were inspected. Subsequently, a pre-designed new roof composition with a hydroaccumulation layer and a larger layer of substrate for better vegetation growth was installed on the roof. During the reconstruction process, a time-lapse camera was located on the roof, recording the time spent by workers removing the original material, transporting new materials to the roof, and the time of subsequent storage.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2022
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů