Vše

Co hledáte?

Vše
Projekty
Výsledky výzkumu
Subjekty

Rychlé hledání

  • Projekty podpořené TA ČR
  • Významné projekty
  • Projekty s nejvyšší státní podporou
  • Aktuálně běžící projekty

Chytré vyhledávání

  • Takto najdu konkrétní +slovo
  • Takto z výsledků -slovo zcela vynechám
  • “Takto můžu najít celou frázi”

Stabilization of Masonry Arches by Hidden Prestressing Cabels with the Possibility of Clearence the Space by Removing the Forged Tie Rod

Identifikátory výsledku

  • Kód výsledku v IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F26%3A0197546" target="_blank" >RIV/00216305:26110/26:0197546 - isvavai.cz</a>

  • Výsledek na webu

    <a href="https://inzynieriamineralna.com.pl/index.php/testowe/article/view/630/418" target="_blank" >https://inzynieriamineralna.com.pl/index.php/testowe/article/view/630/418</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.29227/IM-2024-02-12" target="_blank" >10.29227/IM-2024-02-12</a>

Alternativní jazyky

  • Jazyk výsledku

    polština

  • Název v původním jazyce

    Stabilizacja łuków murowanych za pomocą ukrytych lin naprężających z możliwością oczyszczenia przestrzeni poprzez usunięcie kutego pręta ściągającego

  • Popis výsledku v původním jazyce

    Stabilizacja łuków murowanych za pomocą ukrytych lin naprężających z możliwością oczyszczenia przestrzeni poprzez usunięcie kutego pręta ściągającego jest

  • Název v anglickém jazyce

    Stabilization of Masonry Arches by Hidden Prestressing Cabels with the Possibility of Clearence the Space by Removing the Forged Tie Rod

  • Popis výsledku anglicky

    Stabilization of baroque masonry structures with flat arches by longitudinal prestressing can be advantageously carried out by deliberately introducing a system of prestressing forces into the structure so that the normal effects of the prestressing force exceed the radial effects. Then the arch is transformed into a prestressed tie beam with a curved centreline. Additional prestressing is possible by the method of substitute cable ducts. Then the construction of the masonry arch becomes a prestressed tie rod supporting the wall pillars and even preventing their further spreading, as happens with the original and unprestressed arch.The paper is addressed to the professional community, which, especially in the field of monumental Baroque masonry structures, often deals with failures of masonry arches and vaults. These structures are usually broken by cracks in the top. The supporting structures must resist the long term arching force, which has an oblique direction. While its vertical component creates no problems, the horizontal component of the arc force is considerable and, in addition, acts in the long term already to load the dead weight of the vaulted structure. Horizontal displacements at the base of the vault (of the supports) are the most prevalent failures, accompanied first by the formation of transverse cracks in the top section of the vault. Stabilization is a key step for their permanent rehabilitation.By the additional prestressing, the structure supported by the supports becomes a prestressed tie rod, which in turn prevents further failure development until the pressure reserve is exhausted. The method is so effective that it even allows the original forged tie rod to be removed.The removal of the forged rod of the masonry arch is an example of the high efficiency of the described method. It is a former Baroque granary adapted into a living space. Two roughly elliptical archesof brickwork of 300/600mm top section span the space with clearances of 6.0m and 6.3m. The masonry is made of solid bricks with lime mortar. The passage height under the arches was insufficient, only 1.72 m. It was raised to 2.4 m after the arch was prestressed and the forged tie rod removed. he paper contains examples of the structural design, realization and measurement of the deformation response of the structure. The method can be effectively used to stabilize masonry arches in the case of low stiffness of supports or to free space by removing a forged tie rod. Measurements of the implemented structure show its effectiveness and long-term reliability.

Klasifikace

  • Druh

    J<sub>imp</sub> - Článek v periodiku v databázi Web of Science

  • CEP obor

  • OECD FORD obor

    20102 - Construction engineering, Municipal and structural engineering

Návaznosti výsledku

  • Projekt

  • Návaznosti

    S - Specificky vyzkum na vysokych skolach

Ostatní

  • Rok uplatnění

    2024

  • Kód důvěrnosti údajů

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Údaje specifické pro druh výsledku

  • Název periodika

    Inzynieria Mineralna-Journal of the Polish Mineral Engineering Society

  • ISSN

    1640-4920

  • e-ISSN

  • Svazek periodika

    2024

  • Číslo periodika v rámci svazku

    2

  • Stát vydavatele periodika

    PL - Polská republika

  • Počet stran výsledku

    7

  • Strana od-do

    1-7

  • Kód UT WoS článku

    001697492600020

  • EID výsledku v databázi Scopus

    2-s2.0-105023328063