Smíšené celočíselné programování vs. genetický algoritmus při rozvrhování proudové výroby
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F05%3APU53769" target="_blank" >RIV/00216305:26210/05:PU53769 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Mixed Integer Programming vs. Genetic Algorithm Approach to Scheduling Permutation Flow Shop
Popis výsledku v původním jazyce
Flow shop scheduling problems represent scheduling a set of jobs (composed of tasks) in shops with a product machine layout. Thus, the jobs have the same manufacturing order. A permutation flow shop scheduling problem (PFSSP) is a special version of theproblem where each machine processes the jobs in the same order. In this paper, two different approaches to PFSSP with makespan objective are investigated. First a mixed integer programming model is formulated and it is used for solving the problem by ann optimisation package GAMS. Since the problem belongs to NP-complete problems, this approach is limited to smaller instances. Its reasonable bounds are indicated using benchmarks from OR-Library. For large instances, an approach using genetic algorithmis proposed including its appropriate parameter settings. Computational results show a good performance of genetic algorithm. For suitable parameter settings presented in the paper, this approach is able to find the optimal solution almos
Název v anglickém jazyce
Mixed Integer Programming vs. Genetic Algorithm Approach to Scheduling Permutation Flow Shop
Popis výsledku anglicky
Flow shop scheduling problems represent scheduling a set of jobs (composed of tasks) in shops with a product machine layout. Thus, the jobs have the same manufacturing order. A permutation flow shop scheduling problem (PFSSP) is a special version of theproblem where each machine processes the jobs in the same order. In this paper, two different approaches to PFSSP with makespan objective are investigated. First a mixed integer programming model is formulated and it is used for solving the problem by ann optimisation package GAMS. Since the problem belongs to NP-complete problems, this approach is limited to smaller instances. Its reasonable bounds are indicated using benchmarks from OR-Library. For large instances, an approach using genetic algorithmis proposed including its appropriate parameter settings. Computational results show a good performance of genetic algorithm. For suitable parameter settings presented in the paper, this approach is able to find the optimal solution almos
Klasifikace
Druh
C - Kapitola v odborné knize
CEP obor
BB - Aplikovaná statistika, operační výzkum
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2005
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název knihy nebo sborníku
Katalinic, B. (ed.): DAAAM International Scientific Book 2005
ISBN
3-901509-43-7
Počet stran výsledku
12
Strana od-do
579-590
Počet stran knihy
—
Název nakladatele
DAAAM International
Místo vydání
Wien (Austria)
Kód UT WoS kapitoly
—