Příspěvek k posuvným algoritmům pro rozvrhování s omezenými zdroji s dynamickými změnami
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F07%3APU69334" target="_blank" >RIV/00216305:26210/07:PU69334 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
A Contribution to Shift Algorithms for Resource-Constrained Scheduling with Dynamic Changes
Popis výsledku v původním jazyce
Project scheduling with limited resources is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply theclassical Critical Path Method that needs only polynomial running time. This algorithm can also be used if the durations are changed as a result of process implementation.
Název v anglickém jazyce
A Contribution to Shift Algorithms for Resource-Constrained Scheduling with Dynamic Changes
Popis výsledku anglicky
Project scheduling with limited resources is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply theclassical Critical Path Method that needs only polynomial running time. This algorithm can also be used if the durations are changed as a result of process implementation.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
BB - Aplikovaná statistika, operační výzkum
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2007
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 11th WSEAS International Conference on Systems
ISBN
978-960-8457-90-4
ISSN
—
e-ISSN
—
Počet stran výsledku
5
Strana od-do
401-405
Název nakladatele
WSEAS Press
Místo vydání
Crete Island (Greece)
Místo konání akce
Crete
Datum konání akce
23. 7. 2007
Typ akce podle státní příslušnosti
WRD - Celosvětová akce