Implementační pohled na rozvrhování zakázkové výroby založený na metodě CPM
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F07%3APU69335" target="_blank" >RIV/00216305:26210/07:PU69335 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
An Implementation View on Job Shop Scheduling Based on CPM
Popis výsledku v původním jazyce
The scheduling of manufacturing processes aims to find sequences of jobs on given machines optimal by a selected criterion, e.g. minimal completion time of all operations. With respect to NP-hardness of these problems and the necessity to solve them by heuristic methods, the problem representation and the effectiveness of their procedures is substantial for computations to be completed in a reasonable amount of time. In this paper, we deal with job shop scheduling problem (JSSP) in a disjunctive graph-based representation. Turning all undirected edges into directed ones, the problem is transformed to a problem solvable by the Critical Path Method (CPM). We propose an original implementation of the CPM that makes it possible to decrease its time complexity and thus also the running time of all JSSP iterations.
Název v anglickém jazyce
An Implementation View on Job Shop Scheduling Based on CPM
Popis výsledku anglicky
The scheduling of manufacturing processes aims to find sequences of jobs on given machines optimal by a selected criterion, e.g. minimal completion time of all operations. With respect to NP-hardness of these problems and the necessity to solve them by heuristic methods, the problem representation and the effectiveness of their procedures is substantial for computations to be completed in a reasonable amount of time. In this paper, we deal with job shop scheduling problem (JSSP) in a disjunctive graph-based representation. Turning all undirected edges into directed ones, the problem is transformed to a problem solvable by the Critical Path Method (CPM). We propose an original implementation of the CPM that makes it possible to decrease its time complexity and thus also the running time of all JSSP iterations.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
BB - Aplikovaná statistika, operační výzkum
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2007
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 11th WSEAS International Conference on Computers
ISBN
978-960-8457-92-8
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
540-545
Název nakladatele
WSEAS Press
Místo vydání
Crete Island (Greece)
Místo konání akce
Crete
Datum konání akce
26. 7. 2007
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—