Effective biomass integration into existing combustion plant
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F10%3APU87974" target="_blank" >RIV/00216305:26210/10:PU87974 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Effective biomass integration into existing combustion plant
Popis výsledku v původním jazyce
Fossil fuels such as coal still dominate in current energy production plants. However due to large carbon footprint, rising prices and unclear availability of fossil fuels, increasing interest in renewable and alternative fuels is observable. The optimization approach introduced in this paper supports sustainable biomass-based fuels integration into existing large energy system. The plant involved in the case study produces approximately 3400 TJ of heat and 460 GWh of power per annum. It secures delivery of heat to residential areas, public institutions and industrial enterprises. There are three boilers installed in the boiler house and two of them are fired by coal and biomass. By implementing mid-term operation planning (one year, time step of one month) procedure the conditions for effective biomass utilization are identified first (optimum amount of fuels burned in every boiler with maximum profit with respect to export limitation). Later on, technical-economic limits for addition
Název v anglickém jazyce
Effective biomass integration into existing combustion plant
Popis výsledku anglicky
Fossil fuels such as coal still dominate in current energy production plants. However due to large carbon footprint, rising prices and unclear availability of fossil fuels, increasing interest in renewable and alternative fuels is observable. The optimization approach introduced in this paper supports sustainable biomass-based fuels integration into existing large energy system. The plant involved in the case study produces approximately 3400 TJ of heat and 460 GWh of power per annum. It secures delivery of heat to residential areas, public institutions and industrial enterprises. There are three boilers installed in the boiler house and two of them are fired by coal and biomass. By implementing mid-term operation planning (one year, time step of one month) procedure the conditions for effective biomass utilization are identified first (optimum amount of fuels burned in every boiler with maximum profit with respect to export limitation). Later on, technical-economic limits for addition
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JP - Průmyslové procesy a zpracování
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2010
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Chemical Engineering Transactions
ISSN
1974-9791
e-ISSN
—
Svazek periodika
21
Číslo periodika v rámci svazku
2
Stát vydavatele periodika
IT - Italská republika
Počet stran výsledku
6
Strana od-do
—
Kód UT WoS článku
—