Thermal Disintegration of Sewage Sludge III
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F11%3APU96498" target="_blank" >RIV/00216305:26210/11:PU96498 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Thermal Disintegration of Sewage Sludge III
Popis výsledku v původním jazyce
This research report builds on previous two reports focused on description and evaluation of experiments of thermal and thermochemical disintegration of digested sludge. The effect on sludge dewatering was studied. Based on the laboratory tests the suitable conditions were chosen. A disintegration unit with the capacity of 10.8 t/d of a liquid sludge (refers to a wastewater treatment plant capacity of 10 000 population equivalents) was designed and the effect of disintegration of the back load of waterline was assessed. Further, stress analysis and considerations concerning the vessel heating were elaborated. Finally, an economical evaluation of the process was carried out. In the evaluation, a payback period of approx. 15 y was determined, which emerges from the savings in sludge disposal.
Název v anglickém jazyce
Thermal Disintegration of Sewage Sludge III
Popis výsledku anglicky
This research report builds on previous two reports focused on description and evaluation of experiments of thermal and thermochemical disintegration of digested sludge. The effect on sludge dewatering was studied. Based on the laboratory tests the suitable conditions were chosen. A disintegration unit with the capacity of 10.8 t/d of a liquid sludge (refers to a wastewater treatment plant capacity of 10 000 population equivalents) was designed and the effect of disintegration of the back load of waterline was assessed. Further, stress analysis and considerations concerning the vessel heating were elaborated. Finally, an economical evaluation of the process was carried out. In the evaluation, a payback period of approx. 15 y was determined, which emerges from the savings in sludge disposal.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
JP - Průmyslové procesy a zpracování
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/2B08048" target="_blank" >2B08048: Odpady jako suroviny a zdroje energie (Waste as raw material and energy source)</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2011
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů