Maintenance Optimization for Unavailability Enhancement of Representative Interconnected Infrastructure Based on Minimum Cost
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F26%3A0198496" target="_blank" >RIV/00216305:26220/26:0198496 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/61989100:27240/25:10258201 RIV/61989100:27740/25:10258201
Výsledek na webu
<a href="https://journals.sagepub.com/doi/epub/10.1177/00368504251366357" target="_blank" >https://journals.sagepub.com/doi/epub/10.1177/00368504251366357</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1177/00368504251366357" target="_blank" >10.1177/00368504251366357</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Maintenance Optimization for Unavailability Enhancement of Representative Interconnected Infrastructure Based on Minimum Cost
Popis výsledku v původním jazyce
This paper explores the feasibility of solving a maintenance optimization problem in an interconnected smart grid system, comprising a power grid and a communication network, to reduce system unavailability. The unavailability, which must be in practice under the control of a system operator, is particularly sensitive to critical components in the power grid that must be under preventive maintenance (PM). The main goal is to find an optimal setup of PM within the specified mission time, minimizing system operation costs and reducing time-dependent unavailability. The method for unavailability quantification was remade to include different stochastic models for the unavailability calculation of system components working in different maintenance modes. A cost model is suggested to estimate the cost of various maintenance configurations. By applying these methodological tools designed to benefit users of any complex system, an optimal PM policy was developed for the selected smart grid. This policy reduces grid unavailability by approximately 20% and lowers costs by about 8.5% compared to a configuration without maintenance.
Název v anglickém jazyce
Maintenance Optimization for Unavailability Enhancement of Representative Interconnected Infrastructure Based on Minimum Cost
Popis výsledku anglicky
This paper explores the feasibility of solving a maintenance optimization problem in an interconnected smart grid system, comprising a power grid and a communication network, to reduce system unavailability. The unavailability, which must be in practice under the control of a system operator, is particularly sensitive to critical components in the power grid that must be under preventive maintenance (PM). The main goal is to find an optimal setup of PM within the specified mission time, minimizing system operation costs and reducing time-dependent unavailability. The method for unavailability quantification was remade to include different stochastic models for the unavailability calculation of system components working in different maintenance modes. A cost model is suggested to estimate the cost of various maintenance configurations. By applying these methodological tools designed to benefit users of any complex system, an optimal PM policy was developed for the selected smart grid. This policy reduces grid unavailability by approximately 20% and lowers costs by about 8.5% compared to a configuration without maintenance.
Klasifikace
Druh
J<sub>imp</sub> - Článek v periodiku v databázi Web of Science
CEP obor
—
OECD FORD obor
20201 - Electrical and electronic engineering
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2025
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
SCIENCE PROGRESS
ISSN
0036-8504
e-ISSN
2047-7163
Svazek periodika
108
Číslo periodika v rámci svazku
3
Stát vydavatele periodika
GB - Spojené království Velké Británie a Severního Irska
Počet stran výsledku
23
Strana od-do
1-23
Kód UT WoS článku
001545614100001
EID výsledku v databázi Scopus
2-s2.0-105013193312