Unified Methodology to Risk Management in Projects
Popis výsledku v původním jazyce
In the submission is described the whole process of risk management that is possible to divide into six sub-processes (phases). In concrete, Risk management Planning, Risk Identification, Qualitative Risk Analysis, Quantitative Risk Analysis, Risk Response Planning, and Risk Monitoring and Control. In every of those phases we can use variety of methods, methodologies, techniques and tools. It depends on the concrete situation and general conditions in organizations. We distinguish both general methods (e.g. SWOT Analysis, Ishikawa Diagram), and more sophisticated methods (e.g. FMEA/FTA, HAZOP, SPC etc.) applied in a project. The paper demonstrates, by intuitive way, a complex procedure of risk management processes application. The main aim is to prevent risks and/or reduce their consequences in a project.
Název v anglickém jazyce
Unified Methodology to Risk Management in Projects
Popis výsledku anglicky
In the submission is described the whole process of risk management that is possible to divide into six sub-processes (phases). In concrete, Risk management Planning, Risk Identification, Qualitative Risk Analysis, Quantitative Risk Analysis, Risk Response Planning, and Risk Monitoring and Control. In every of those phases we can use variety of methods, methodologies, techniques and tools. It depends on the concrete situation and general conditions in organizations. We distinguish both general methods (e.g. SWOT Analysis, Ishikawa Diagram), and more sophisticated methods (e.g. FMEA/FTA, HAZOP, SPC etc.) applied in a project. The paper demonstrates, by intuitive way, a complex procedure of risk management processes application. The main aim is to prevent risks and/or reduce their consequences in a project.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JC - Počítačový hardware a software
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2008
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 14th International Congress of Cybernetics and Systems of WOCS
ISBN
978-83-7493-400-8
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
—
Název nakladatele
Wroclaw University of Technology
Místo vydání
Wroclaw
Místo konání akce
Wroclaw
Datum konání akce
9. 9. 2008
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—