RISK MANAGEMENT OF AN INSUFFICIENTLY ELABORATE PROJECT DOCUMENTATION
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26610%2F18%3APU128980" target="_blank" >RIV/00216305:26610/18:PU128980 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
RISK MANAGEMENT OF AN INSUFFICIENTLY ELABORATE PROJECT DOCUMENTATION
Popis výsledku v původním jazyce
This contribution is aimed at the problems of an active access of a middle-size building enterprise of a regional significance to a management of a risk of an insufficiently elaborate project documentation. It goes out from the year 2013, when consequences of a financial crisis whose general phenomenon was that orders of building enterprises were voluminously and financially lower, died away in the Czech Republic. Building enterprises often found themselves in a situation when they were made to realize building orders on the basis of the elaborate project documentation of poor quality. These pieces of knowledge are practically applied to the examined building enterprise X1 s.r.o. which fought a lack of building orders in 2013 and therefore when it succeeded in selective proceedings on a construction of four row family houses, it was made to take this order and to realize it on the basis of a building permit documentation of poor quality. Because one of the authors of this article worked as an assistant of a master builder during a construction and elaborated all budgets connected with the given building order, the other authors of the contribution could also cooperate with the master builder, the investor, the technical supervisor of the investor and the projector of the structure on a removal of particular mistakes and imperfections included in the project. By means of this active cooperation, the project documentation risk was successfully eliminated in the end, the planned budgetary costs were kept and the contracting fine which the building enterprise X1 s.r.o. would have been liable to pay in case of a failure of a term of a work completion was avoided. This contribution can be divided into two main parts, namely into theoretical and practical ones. While the theoretical part of the article is intent on the basic concepts connected with the problems of the project documentation risk, its practical part includes a complete project documentation of realized row f
Název v anglickém jazyce
RISK MANAGEMENT OF AN INSUFFICIENTLY ELABORATE PROJECT DOCUMENTATION
Popis výsledku anglicky
This contribution is aimed at the problems of an active access of a middle-size building enterprise of a regional significance to a management of a risk of an insufficiently elaborate project documentation. It goes out from the year 2013, when consequences of a financial crisis whose general phenomenon was that orders of building enterprises were voluminously and financially lower, died away in the Czech Republic. Building enterprises often found themselves in a situation when they were made to realize building orders on the basis of the elaborate project documentation of poor quality. These pieces of knowledge are practically applied to the examined building enterprise X1 s.r.o. which fought a lack of building orders in 2013 and therefore when it succeeded in selective proceedings on a construction of four row family houses, it was made to take this order and to realize it on the basis of a building permit documentation of poor quality. Because one of the authors of this article worked as an assistant of a master builder during a construction and elaborated all budgets connected with the given building order, the other authors of the contribution could also cooperate with the master builder, the investor, the technical supervisor of the investor and the projector of the structure on a removal of particular mistakes and imperfections included in the project. By means of this active cooperation, the project documentation risk was successfully eliminated in the end, the planned budgetary costs were kept and the contracting fine which the building enterprise X1 s.r.o. would have been liable to pay in case of a failure of a term of a work completion was avoided. This contribution can be divided into two main parts, namely into theoretical and practical ones. While the theoretical part of the article is intent on the basic concepts connected with the problems of the project documentation risk, its practical part includes a complete project documentation of realized row f
Klasifikace
Druh
J<sub>ost</sub> - Ostatní články v recenzovaných periodicích
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2018
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Terra Spectra
ISSN
1338-0370
e-ISSN
—
Svazek periodika
neuveden
Číslo periodika v rámci svazku
2/2017
Stát vydavatele periodika
SK - Slovenská republika
Počet stran výsledku
11
Strana od-do
22-33
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—