Reconstruction of a constructed wetland with horizontal subsurface flow after 18 years of operation
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F25006096%3A_____%2F13%3A%230000143" target="_blank" >RIV/25006096:_____/13:#0000143 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/60460709:41330/13:60899 RIV/00216305:26110/14:PU112697
Výsledek na webu
<a href="http://www.ncbi.nlm.nih.gov/pubmed/24037174" target="_blank" >http://www.ncbi.nlm.nih.gov/pubmed/24037174</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Reconstruction of a constructed wetland with horizontal subsurface flow after 18 years of operation
Popis výsledku v původním jazyce
The constructed wetland (CW) for 326 PE with horizontal subsurface flow at Kotencice, Central Bohemia, Czech Republic, was built in 1994. Despite the relatively high efficiency of the CW, the filtration beds suffered from clogging, and therefore it was decided in 2011 to rebuild the whole system. The new treatment system was built as an experimental system consisting of four different combinations of horizontal and vertical beds. The major aim of the design was to determine the best hybrid combination which then could be used in the future for refurbishment of older horizontal flow CWs or for the new systems. The mechanical pretreatment consists of mechanical bar screens, a new Imhoff tank, and the original settling tank which has been converted into the accumulation tank from where the wastewater is pumped into the wetlands. The filters are planted with Phragmites australis, Phalaris arundinacea, Iris pseudacorus, Iris sibirica, Glyceria maxima and Lythrum salicaria in order to evalua
Název v anglickém jazyce
Reconstruction of a constructed wetland with horizontal subsurface flow after 18 years of operation
Popis výsledku anglicky
The constructed wetland (CW) for 326 PE with horizontal subsurface flow at Kotencice, Central Bohemia, Czech Republic, was built in 1994. Despite the relatively high efficiency of the CW, the filtration beds suffered from clogging, and therefore it was decided in 2011 to rebuild the whole system. The new treatment system was built as an experimental system consisting of four different combinations of horizontal and vertical beds. The major aim of the design was to determine the best hybrid combination which then could be used in the future for refurbishment of older horizontal flow CWs or for the new systems. The mechanical pretreatment consists of mechanical bar screens, a new Imhoff tank, and the original settling tank which has been converted into the accumulation tank from where the wastewater is pumped into the wetlands. The filters are planted with Phragmites australis, Phalaris arundinacea, Iris pseudacorus, Iris sibirica, Glyceria maxima and Lythrum salicaria in order to evalua
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
DJ - Znečištění a kontrola vody
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/FR-TI3%2F778" target="_blank" >FR-TI3/778: Čištění odpadních vod v integrovaném biotechnologickém systému</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Údaje specifické pro druh výsledku
Název periodika
Water Science & Technology
ISSN
0273-1223
e-ISSN
—
Svazek periodika
68
Číslo periodika v rámci svazku
5
Stát vydavatele periodika
GB - Spojené království Velké Británie a Severního Irska
Počet stran výsledku
7
Strana od-do
1195-1202