Využití 3D simulace v interních logistických procesech
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F46747885%3A24210%2F08%3A%230000255" target="_blank" >RIV/46747885:24210/08:#0000255 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Using 3D Simulation in an Industry Internal Logistic Process
Popis výsledku v původním jazyce
"The paper describes the usage of logistic trains (LT) in an internal supply process. Modern industries frequently use LT to improve performance by reducing manual work, work in process, product switch times, etc. The LT design and process analysis are performed using computer simulation. The results of simulation are visualised by using 3D graphics and animation. This paper focuses on the use of computer simulation in Arena connected by 3D Arena Player which is used as the visualisation tool. The project outcomes, based on the simulation optimisation, lead to the reduction of logistic costs and improvement in the availability of material in production lines. These in turn, reduce work in process material (by reducing stock levels and buffers in the production lines) and setting the minimum number of LT. The benefits of 3D animation are easy to state as they validate spatial layout, allow better designing of LT routes and could limit shock risk with different layout options. "
Název v anglickém jazyce
Using 3D Simulation in an Industry Internal Logistic Process
Popis výsledku anglicky
"The paper describes the usage of logistic trains (LT) in an internal supply process. Modern industries frequently use LT to improve performance by reducing manual work, work in process, product switch times, etc. The LT design and process analysis are performed using computer simulation. The results of simulation are visualised by using 3D graphics and animation. This paper focuses on the use of computer simulation in Arena connected by 3D Arena Player which is used as the visualisation tool. The project outcomes, based on the simulation optimisation, lead to the reduction of logistic costs and improvement in the availability of material in production lines. These in turn, reduce work in process material (by reducing stock levels and buffers in the production lines) and setting the minimum number of LT. The benefits of 3D animation are easy to state as they validate spatial layout, allow better designing of LT routes and could limit shock risk with different layout options. "
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JR - Ostatní strojírenství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2008
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of 15th European Concurrent Engineering Conference (ECEC2008)
ISBN
978-90-77381-39-7
ISSN
—
e-ISSN
—
Počet stran výsledku
5
Strana od-do
—
Název nakladatele
EUROSIS-ETI Publication
Místo vydání
Porto
Místo konání akce
Porto
Datum konání akce
9. 4. 2008
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
000255590500018