Application of the Reliability centered maintenance (RCM) is effective tool, but it shouldn't be one way process. There are many possibilities how to use the results secondarily. RCM requires among other things the production losses equation (PLE) as input. The PLE is a function of economic losses per time during shut-down. If the time of production stopping (caused by failure or preventive maintenance) is know, it's easy to calculate the total value of the production loss. In general it is the integralof this function. The PLE should take into account all the important parameters of the production process, such as the redundancy, the spares and their count, the sales of products etc. The RCM analysis uses this equation as an invariant fact and the equipment maintenance is optimized on the basis of it. The RCM analysis is conducted dominantly on the strategic facilities (it's mean that production losses during the shut-down are huge) because of the substantial time and knowledge deman
Název v anglickém jazyce
RCM outputs utilization in optimizing production process
Popis výsledku anglicky
Application of the Reliability centered maintenance (RCM) is effective tool, but it shouldn't be one way process. There are many possibilities how to use the results secondarily. RCM requires among other things the production losses equation (PLE) as input. The PLE is a function of economic losses per time during shut-down. If the time of production stopping (caused by failure or preventive maintenance) is know, it's easy to calculate the total value of the production loss. In general it is the integralof this function. The PLE should take into account all the important parameters of the production process, such as the redundancy, the spares and their count, the sales of products etc. The RCM analysis uses this equation as an invariant fact and the equipment maintenance is optimized on the basis of it. The RCM analysis is conducted dominantly on the strategic facilities (it's mean that production losses during the shut-down are huge) because of the substantial time and knowledge deman
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JS - Řízení spolehlivosti a kvality, zkušebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
11th International Probabilistic Safety Assessment and Management Conference and the Annual European Safety and Reliability Conference 2012
ISBN
9781622764365
ISSN
—
e-ISSN
—
Počet stran výsledku
7
Strana od-do
242-248
Název nakladatele
—
Místo vydání
Helsinki
Místo konání akce
Helsinki
Datum konání akce
1. 1. 2012
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—