Resilient power pilot project
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F47307218%3A_____%2F10%3A00000023" target="_blank" >RIV/47307218:_____/10:00000023 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Resilient power pilot project
Popis výsledku v původním jazyce
Blackout is a "Sword of Damocles" of our civilization. Due to dependence on electricity the society could be threatened within a few seconds. Basic physiological needs and safety needs would not be possible to satisfy without electricity. If the imbalance of production and consumption in the electricity supply is not immediately removed, the power system breaks down in a few seconds and results into blackout. This situation may then last for days or weeks. The current public distribution networks are passive and they are not able to provide electricity supply from local sources without connection to the transmission grid. Power distributors can remove the unacceptable risk of long-term blackout affecting all regions. The power distributors should be able to provide islanding with utilization of local generation in case the transmission system breaks down (i.e. the system failure). Island operation of electrical networks has a similar function as a firewall in computer networks. Recomme
Název v anglickém jazyce
Resilient power pilot project
Popis výsledku anglicky
Blackout is a "Sword of Damocles" of our civilization. Due to dependence on electricity the society could be threatened within a few seconds. Basic physiological needs and safety needs would not be possible to satisfy without electricity. If the imbalance of production and consumption in the electricity supply is not immediately removed, the power system breaks down in a few seconds and results into blackout. This situation may then last for days or weeks. The current public distribution networks are passive and they are not able to provide electricity supply from local sources without connection to the transmission grid. Power distributors can remove the unacceptable risk of long-term blackout affecting all regions. The power distributors should be able to provide islanding with utilization of local generation in case the transmission system breaks down (i.e. the system failure). Island operation of electrical networks has a similar function as a firewall in computer networks. Recomme
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/2A-1TP1%2F065" target="_blank" >2A-1TP1/065: Zvýšení odolnosti distribuční soustavy proti důsledkům dlouhodobého výpadku přenosové soustavy ČR s cílem zvýšení bezpečnosti obyvatel.</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2010
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
TIEMS 17th Annual Conference 2010, June 8 - 11 2010
ISBN
978-94-90297-02-2
ISSN
—
e-ISSN
—
Počet stran výsledku
8
Strana od-do
1-8
Název nakladatele
The International Emergency Management Society
Místo vydání
Oslo, Norway
Místo konání akce
Beijing, China
Datum konání akce
8. 6. 2010
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—